https://www.engineeringnews.co.za

Theta Hill gold project, South Africa

9th November 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Theta Hill gold project.

Location
The project is located near the historical gold mining town of Pilgrim’s Rest, in Mpumalanga, South Africa.

Client
Stonewall Resources.

Project Description
A scoping study on Theta Hill has shown that the historical mines of this goldfield have opencut oxide gold potential.

The project contains an opencut Joint Ore Reserves Committee- (Jorc-) compliant resource of 4.48-million tonnes grading 4.14g/t gold for 600 000 oz.

This scoping study shows the potential for average gold production of about 67 000 oz/y for 7.6 years.

The project involves in-pit waste emplacement and strip-style mining of three gold-bearing seams using surface miners among standard mining equipment, including dozers, rock-breakers and minimal drill-and-blast.

The site is situated within 2 km by road of the existing, fully permitted carbon-in-leach (CIL) plant, with an $11.1-million capital upgrade planned.

The CIL plant refurbishment and upgrade will involve installing a mobile crushing unit, with a new 1.2 MW ball mill and gravity circuit. A portion of the existing CIL tanks will be used, with additional tanks added.

A refurbished elution circuit and gold room will be installed, with reagent sections replaced.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Theta Hill shows a post-tax net present value, at a 7.5% discount rate, of about $152-million and an internal rate of return of about 132%, with a payback of about 7.4 months.

Value
The project will require a peak capital requirement of $16-million.

Duration
The project will take ten months to construct.

Latest Developments
Following the positive scoping study, Stonewall’s board has decided to progress Theta Hill towards a decision to mine in 2019, with a full feasibility study now planned. The study is targeted for completion in the first quarter of 2019.

Further, Stonewall intends to convert part of its large 5.8-million-ounce mineral resource into a mining reserve. Additional drilling is under way at Theta Hill to improve the Jorc confidence category to primarily indicated ahead of reserve declaration scheduled for the first quarter of 2019.

Key Contracts and Suppliers
METS (process design).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Stonewall Resources, tel +61 2 9460 2021 or email info@stonewallresources.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

MBE Minerals SA (Pty) Ltd
MBE Minerals SA (Pty) Ltd

Your global lifecycle technology & service partner for materials & minerals processing equipment for coal, iron ore, copper, manganese & other...

VISIT SHOWROOM 
Alcohol Breathalysers
Alcohol Breathalysers

Supplier & Distributor of the Widest Range of Accurate & Easy-to-Use Alcohol Breathalysers

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.045 1.069s - 127pq - 2rq
Subscribe Now