https://www.engineeringnews.co.za

Rukwa coal-to-power project, Tanzania

1st December 2017

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Rukwa coal-to-power project (RCPP).

Location
Tanzania.

Client
Edenville Energy.

Project Description
A feasibility study completed on the project has indicated an economically sound project with a 30-year, 120 MW coal-fired power plant. There is the possibility that the power plant could be scaled up to 300 MW.

The project hosts 173-million tons of measured and indicated coal, sufficient to support the station over the life of the project.

Output has been estimated at 10 000 t/m.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Independent power modelling consultancy Diamond Energy has completed a new financial model for Aim-listed Edenville Energy’s RCPP.

The new financial model builds on and validates the results and integrity of the financial model compiled from the results of the 2015 power plant feasibility study.

It has resulted in a 14% increase in the project’s pretax net present value to $252-million, from the previous estimate of $220-million, while the internal rate of return has improved to 23.4%, compared with 23.1% in the 2015 study.

Value
The capital expenditure to deliver a combined mine and 120 MW power plant is estimated at between $180-million and $200-million.

Duration
Not stated.

Latest Developments
Edenville Energy is reviewing options to further optimise the efficiency and throughput of its wash plant at the recently commissioned Rukwa coal project on expectations of greater demand beyond its planned output of 10 000 t/m.

The company started producing washed coal for sale in October, delivering on commercial terms to several customers in Tanzania and neighbouring countries following the completion of the commissioning and testing of the wash plant, which started in late September.

“These initial test shipments, currently totalling over 1 000 t, are to parties that have expressed interest in placing long-term coal orders with the company, subject to finalising pricing and quality, that, in total, could exceed the initial planned output of 10 000 t/m, which is targeted to be achieved by the end of January 2018,” Edenville has said in an update to shareholders.

Edenville is considering an option to install a purpose-built prescreening mechanism to reduce the level of fine material that enters the plant, providing more capacity for the washing of sized coal.

Meanwhile, Edenville and its partner, Chinese State-owned hydropower engineering and construction company Sinohydro Corporation, have been meeting with Tanzania State-owned Electricity Company Tanesco about the way forward for the development of the planned mine mouth power plant at the Rukwa coal project site, in the Sumbawanga region.

“Several areas were covered, including the size of the project, the proposed structure of a power purchase agreement, tariff levels and connectivity to the planned transmission line that will pass through the Sumbawanga region,” Edenville has noted.

Further discussions and clarification between the parties could lead to a structured agreement between the parties to move the project forward, in line with the planned construction by Tanesco of the transmission line and substation infrastructure at Sumbawanga
 
Key Contracts and Suppliers
Not stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Edenville Energy, tel +44 20 7653 9850 or email info@edenville-energy.com.
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Vikela Aluvin (Pty) Ltd
Vikela Aluvin (Pty) Ltd

Complete range of security sealing solutions including security seals bags and labels.

VISIT SHOWROOM 
CSIR International Convention Centre (CSIR ICC)
CSIR International Convention Centre (CSIR ICC)

CSIR International Convention Centre (CSIR ICC) - the leading conference and events venue in Pretoria/Tshwane.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.058 0.961s - 149pq - 2rq
Subscribe Now