https://www.engineeringnews.co.za

More production flagged at Lake Wells

7th June 2022

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Updated flow models at the Lake Wells sulphate of potash (SoP) project, in Western Australia, have flagged the potential for increased production from brine from the 120 000 t/y previously indicated, to 135 000 t/y.

A 2019 definitive feasibility study (DFS) into the project found that SoP production from brine abstraction could reach 100 000 t/y, with an additional 50 000 t/y of SoP to be produced through the addition and conversion of muriate of potash (MoP) to SoP.

The brine abstraction rate was later optimised through a front-end engineering design (FEED) study, leading to an optimised SoP output of 120 000 t/y.

ASX-listed Australian Potash told shareholders on Tuesday that additional improvements realised in the recent modelling also indicated that 890 supply bores would be suitable for life-of-mine (LoM) operations, whereas the original FEED development model had 172 bores over the LoM.

“We continue to apply a rigorous de-risking methodology to the development and operational strategies at the Lake Wells project, including crucially in the fundamental brine abstraction (mining) process. The Lake Wells project will be developed as a 100% borefield abstraction project with no reliance on surface trenching to collect brine,” said Potash Australia MD and CEO Matt Shackleton.

“The early works program we undertook through 2021 and early 2022 has demonstrated improvements in the brine borefield, and data from constructed bores has allowed us to further optimise the flow model underpinning the Lake Wells development, providing us the opportunity to produce more SoP with less bores over the LoM.

“The financial implications of these results are being worked through, but less bores means lower initial capital cost and lower sustaining capital costs which we reasonably anticipate will flow through to the Lake Well’s financial outcomes. Updated financial modelling will be announced to the ASX as soon as it is available,” said Shackleton.

The original DFS estimated that the project would require a capital investment of some A$208-million, and would have a mine life of 30 years.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sulzer Pumps (SA) (Pty) Ltd
Sulzer Pumps (SA) (Pty) Ltd

Sulzer South Africa, established in 1922, partners with critical industries like power, oil & gas, water, mining, and chemicals to boost...

VISIT SHOWROOM 
The Steel Tube Export Association of South Africa
Steel Tube Export Association of South Africa

The Steel Tube Export Association of South Africa was established to develop sustainable, internationally competitive carbon steel tube and pipe...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.054 0.995s - 140pq - 2rq
Subscribe Now