Iron Bridge magnetite project – Stage 2, Australia
Name of the Project
Iron Bridge magnetite project – Stage 2.
Location
The project is located 145 km south of Port Hedland, in Pilbara, Western Australia.
Project Owner/s
The project is owned through an unincorporated joint venture between Fortescue Metals Group subsidiary FMG Iron Bridge, or FMG IB (69%), and Formosa Steel (31%).
FMG will manage and operate the project with full marketing rights.
Project Description
The project has a mineral resource of 5.45-billion tonnes, including an ore reserve of 716-million tonnes.
The project has a mine life of more than 20 years.
This Stage 2 development follows the $500-million investment in the successful Stage 1 construction of large-scale pilot and demonstration plants, which have validated key equipment and magnetite production processes for the full-scale Stage 2 ore processing facility.
Stage 2 development includes:
• a 22-million-wet-metric-tonnes-a-year ore processing facility (once at full operational capacity);
• an airstrip and expanded village;
• a 195 km canning basin water pipeline;
• a 135 km concentrate pipeline to FMG’s Herb Elliot port facility, in Port Hedland, and a return process water pipeline; and
• port handling facilities, including concentrate dewatering, covered storage and reclaiming/conveying to existing port outload circuits.
The project aims to produce 22-million wet metric tonnes a year once full operational capacity is achieved. Iron Bridge will deliver a premium product with an iron content of 67%.
Potential Job Creation
About 3 000 people will be employed during construction and 900 full-time positions will be created once operations start.
All-in Sustaining Costs/All-in Costs
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Total Stage 2 capital costs are estimated at $2.6-billion. The JV partners are each responsible for their equity share of total capital expenditure for Stage 2.
Planned Start/End Date
Delivery of first ore is expected in the first half of 2022, with ramp-up to full production within 12 months.
Latest Developments
NRW Holdings has been awarded a A$70-million bulk earthworks contract at the Iron Bridge magnetite mine.
The contract scope will include the bulk earthworks and drainage for roads, and the processing plant and infrastructure for the new mine site development, with the contract to last about 45 weeks.
At peak construction, NRW is expected to employ about 200 staff at the project.
Key Contracts and Suppliers
NRW Holdings (bulk earthworks).
Contact Details for Project Information
Fortescue, tel +61 8 6218 8888.
Formosa Steel, tel +886 2 2712 221.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation