Gahcho Kué diamond project, Canada

16th October 2015

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Gahcho Kué diamond project, Northwest Territories (NWT), Canada.

Client
Gahcho Kué Joint Venture (JV) – a collaboration between De Beers Canada (51%) and Mountain Province Diamonds (49%).

Project Description
Gahcho Kué, which is Chipewyan for ‘a place where big rabbits are found’, is located at Kennady Lake, 280 km north-east of Yellowknife and 80 km east of De Beers’ existing Snap Lake mine, in NWT. The diamond prospect is one of the largest new diamond projects under development globally.

The project consists of the Hearne North and South pipes; the 5034 West pipe, the Central and North-East pipes; the 5034 South pipe; the 5034 North pipe; Wallace; and the Dunn Sheet, Tuzo and Tesla diamondiferous kimberlite pipes, sheets and dykes.

A revised and updated feasibility study on the Gahcho Kué project has confirmed the remote project’s robust metrics.

The deposit has current National Instrument 43-101-compliant total probable reserves of 55.5-million carats, contained in 35.4-million tonnes grading 1.57 ct/t.

The mine life has been estimated at 12 years, during which the operation will produce about 53.4-million carats at an average yearly rate of 4.45-million carats using standard drill and blast, and truck and shovel, equipment and pit designs, which are similar to those of other openpit diamond mines operating in the area.

The average yearly output for the first three years of full production from 2017 to 2019 will be about 5.6-million carats.

Ore will be fed to a three-million-tonne-a-year processing plant, with three stages of crushing, dense-media separation and X-ray/grease diamond-recovery circuits.

Supporting infrastructure includes a 14.1 MW packaged diesel power plant, a 1 350 m gravel airstrip, a five-bay truck shop, an emulsion plant, a 40-million-litre fuel storage facility and a 432-bed accommodation/office complex.

Net Present Value/Internal Rate of Return
None stated.

Value
According to the revised and updated feasibility study, the project will cost C$859-million to construct and the operation will require working capital of C$80-million.

Costs to ramp up the operation to January 2017 have been estimated at C$82-million.

Duration
Production aims to start in 2016.

Latest Developments
Construction of the Gahcho Kué project is more than 70% complete.

Detailed engineering and procurement are complete and the process plant and truck maintenance buildings are on track to be enclosed by the end of October.

Safety performance at the project also remains good, with no lost-time injuries over the past 18 months.

"Gahcho Kué continues to meet our lending group's tests to completion, and further drawdowns against the company's $370-million project finance facility have been approved. We have drawn down $137-million against the facility and expect to have drawn down a total of $158-million by year-end," Mountain Province president and CEO Patrick Evans has stated.

Staff at Gahcho Kué has peaked at about 600 on-site employees and contractors and will start to decline in the months ahead as significant construction projects are completed. During production, there will be about 400 employees at Gahcho Kué.

Key Contracts and Suppliers
JDS Energy & Mining (feasibility study).

On Budget and on Time?
Construction remains within budget and on schedule for first production to start in the second half of 2016.


Contact Details for Project Information
De Beers Canada external and corporate affairs tel + 1 416 645 1710.
Mountain Province Diamonds, tel +1 416 361 3562, fax +1 416 603 8565 or email info@mountainprovince.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Industrial Nozzles & Systems (Pty) Ltd
Industrial Nozzles & Systems (Pty) Ltd

Industrial Nozzles & Systems (Pty) Ltd (Est. 2000) exclusive representative in Southern Africa for LECHLER GmbH (Est. 1879) - Europe's leading...

VISIT SHOWROOM 
ATI Systems
ATI Systems

ATI systems comprises five divisions: electrical assemblies, drives and controls, feedback sensors, enclosures, and strip guiding.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.145 1.105s - 147pq - 2rq
Subscribe Now