Bumi Barito Mineral coal project, Indonesia – update

Bumi Barito Mineral coal project, Indonesia – update

Photo by Cokal

13th November 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Bumi Barito Mineral (BBM) coal project.

Location
Central Kalimantan, Indonesia.

Project Owner/s
Cokal (60%).

Cokal is preparing a submission regarding the BBM underground mining project to the Indonesian government for its consideration in granting the maximum foreign ownership (70%) of BBM for the life-of-mine.

Project Description
The project envisages the construction of an underground mine, which will use three continuous miner development units and a built-for-purpose longwall plow.

The highwall punch mine configuration and shallow nature of the inferred resources will not constrain longwall output because of outbye coal clearance systems, which is the case in similar plow operations installed in existing older mines.

The project is expected to produce two-million tonnes a year of saleable coal from its third year of production.

Potential Job Creation
The company currently has about 20 staff on site to prepare it for the initial construction work to develop the project.

Net Present Value/Internal Rate of Return
As a result of ASX restrictions on forward statements, Cokal may not provide any of these estimates in a public statement.

Capital Expenditure
As a result of ASX restrictions on forward statements, Cokal may not provide any of these estimates in a public statement.

Planned Start/End Date
Not stated.

Latest Developments
Cokal has tapped PT Harmoni Panca Utama (HPU) as its preferred tenderer to provide contract mining services for the development and mining of its BBM coking coal project.

HPU will be responsible for openpit overburden removal, the provision of the required mining fleet and associated equipment, and coal hauling from in-pit to a near out-of-pit intermediate stockpile facility.

Cokal has said that HPU represents a significant milestone for the near-term development of BBM into a coal mine producing premium export-quality coking coal and pulverised coal injection products.

Key Contracts, Suppliers and Consultants
PT Harmoni Panca Utama (preferred contractor – contract mining services).

Contact Details for Project Information
Cokal, tel +62 21 5790 3265 or email info@cokal.com.au.

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.053 1.275s - 149pq - 2rq
Subscribe Now