https://www.engineeringnews.co.za

Arizona Mining reports robust PEA results, sets production target for 2020

4th April 2017

By: Henry Lazenby

Creamer Media Deputy Editor: North America

     

Font size: - +

VANCOUVER (miningweekly.com) – Canadian mineral exploration and development company Arizona Mining has published robust economics from a preliminary economic assessment (PEA) for its Taylor zinc/lead/silver sulphide deposit, located on the 100%-owned Hermosa project, in Arizona.

The PEA, published Monday and prepared by Canada-based AMC Mining Consultants, has calculated an after-tax net present value, using an 8% discount rate, of $1.26-billion, with a robust internal rate of return (IRR) of 42%.

"The project has been approved to progress to the feasibility stage and we expect to complete this work, initiate state permitting for operations on our patented land and break ground on the tailings facility by the end of 2017.

“With relatively low capital expenditure (capex) and a very robust IRR, our goal will be to fund the project with little to no equity. In light of the project's strong cash flow, we should be able to attract significant conventional debt ($250-million to $300-million), offtake financing ($75-million to $150-million) and a silver stream ($200-million to $350-million). We will minimise equity dilution wherever we can to benefit all shareholders,” stated president and CEO Jim Gowans.

Payback of the $457.17-million preproduction capex is estimated to take 1.7 years, leveraging forecast stronger zinc prices. Life-of-mine capex has been estimated at $957.37-million, including $500-million in sustaining capex.

The Taylor mine will produce on average 287-million pounds of zinc a year, as well as 286-million pounds of lead and 5.5-million ounces of silver a year.

The PEA was based on long-term prices of $1.10/lb for zinc, $1/lb for lead and $20/oz of silver.

The PEA for the Taylor sulphide deposit is based on an underground mine plan with initial production starting in 2020 and ramping up to 10 000 t/d in 2023. The zinc/lead/silver ores will be hoisted to the surface by a vertical shaft and processed through a 10 000 t/d concentrator located on the Trench patented property. The initial mine plan is based on a conservative subset of 60.8-million tons (of the 72.5-million tons of measured and indicated resources) grading 4.4% zinc, 4.3% lead and 1.7 oz/t silver.

The deposit now comprises 8.6-million tons in the measured category grading 9.7% zinc-equivalent, plus 63.8-million tons in the indicated category grading 10.6% zinc-equivalent and 38.6-million tons in the inferred category grading 11.6% zinc-equivalent.

Arizona Mining intends to initiate permitting with the Arizona state government in the current half of 2017, with the expectation, based on extensive discussions with regulators, that the full state permitting process on the company's patented properties should take about 12 to 18 months. 

"We are extremely pleased by the robust economics shown in the PEA for the Taylor deposit. In addition, the resource has been significantly upgraded and has tremendous potential to expand further, recoveries have improved, and we continue to see keen, ongoing interest in our future concentrate from smelters and other potential offtake groups,” Gowans said.

Edited by Chanel de Bruyn
Creamer Media Online Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 
Werner South Africa Pumps & Equipment (PTY) LTD
Werner South Africa Pumps & Equipment (PTY) LTD

For over 30 years, Werner South Africa Pumps & Equipment (PTY) LTD has been designing, manufacturing, supplying and maintaining specialist...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.052 1.272s - 140pq - 2rq
Subscribe Now