https://www.engineeringnews.co.za

Arizona Mining lifts Taylor deposit resource

1st November 2016

By: Henry Lazenby

Creamer Media Deputy Editor: North America

  

Font size: - +

VANCOUVER (miningweekly.com) – TSX-listed Arizona Mining on Sunday announced a new mineral resource for the Taylor zinc/lead/silver sulphide deposit, located on its 100%-owned Hermosa project, in Arizona, in the US.

The deposit now comprises 31.1-million tons in the indicated resource category grading 10.9% zinc equivalent (ZnEq), plus 82.7-million tons of inferred resources grading 11.1% ZnEq, when applying a 4% ZnEq cutoff grade.

“Based on work to date, this updated mineral resource estimate indicates that the Taylor deposit has expanded substantially and continues to be one of the best quality growth stories in the mining sector. In addition, should the technical feasibility and economic viability of the project be established, continued metallurgical testing indicates the deposit will produce clean, saleable concentrates with no deleterious elements,” commented CEO Jim Gowans.

Arizona Mining advised that infill drilling had highlighted high-grade zones within the resource, which is also showing excellent continuity that should enable bulk mining methods. The resource remains open for expansion to the north, west and south over mineral rights controlled by the company.

The company added that other target types of mineralisation had also been identified on its mineral holdings and would be drill tested in the coming months.

Edited by Samantha Herbst
Creamer Media Deputy Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Astore Keymak
Astore Keymak

Astore Keymak is one of South Africa’s leading suppliers of high-quality Thermoplastic Pipeline Systems, with branches in the major provinces.

VISIT SHOWROOM 
Monitor Distributors
Monitor Distributors

We at Hawk High Pressure Pumps specialise in industrial pumps and pumping systems. Our high pressure washing equipment is locally manufactured and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.061 0.272s - 140pq - 2rq
Subscribe Now