https://www.engineeringnews.co.za

Trés Estradas phosphate project, Brazil

2nd September 2016

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name of the Project
Trés Estradas phosphate project.

Location
The Trés Estradas project is located in the municipality of Lavras do Sul, about 320 km south-west of Porto Alegre, the capital city of Rio Grande do Sul, in southern Brazil.

Client
Aguia Resources.

Project Description
Trés Estradas has an audited pit-constrained resource estimated at 74.7-million tonnes with an average grade of 4.13% phosphorous pentoxide, comprising 745 000 t of measured resource grading 4.42% phosphorous pentoxide, 15.07-million tonnes of indicated resource grading 4.75% phosphorous pentoxide and 58.89-million tonnes of inferred resource grading 3.97% phosphorous pentoxide.

The proposed project will also include a resource of 2.75-million tonnes grading 4.37% phosphorous pentoxide from the nearby Joca Tavares carbonatite, which includes 915 000 t of measured resource grading 3.98% phosphorous pentoxide, 1.5-million tonnes of indicated resource grading 4.31% phosphorous pentoxide and 329 000 t of inferred resource grading 5.74% phosphorous pentoxide.

The optimised preliminary economic assessment envisions a mining operation comprising mining phosphate from the Trés Estradas deposit and the Joca Tavares deposit located south-east of Trés Estradas.

Phosphate material from both deposits will be milled and processed at Trés Estradas.

The project includes an openpit, truck-and-shovel operation, mining both the deposits over a life-of-mine (LoM) of 14 years.

With a capacity of 500 000 t/y of phosphate concentrate, the average feed to the processing plant will be 4.5-million tonnes a year, resulting in an LoM production of 6.6-million tonnes of phosphate concentrate and another 22.7-million tonnes of calcite, averaging about 466 000 t of phosphate concentrate and 1.6-million tonnes of by-product calcite yearly.

Jobs to be Created
Not stated.

Net Present Value/Internal Rate of Return
The PEA estimates a post-tax net present value, at a 7.5% discount rate, of $400-million and a post-tax internal rate of return of 43%.

Value
The project has an initial capital expenditure of $118.23-million.

Duration
Trés Estradas project will have an LoM of 14 years, preceded by three years of construction and ramp-up of production.

Latest Developments
Aguia has said that it is looking forward to aggressively moving the Trés Estradas project forward into full bank feasibility and to continue with its permitting process, which is well advanced.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Aguia Resources, tel +61 2 9299 9690, fax +61 2 9299 9629 or email info@aguiaresources.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Rio-Carb
Rio-Carb

Rio Carb is an OEM (Original Equipment Manufacturer) of R-C700 Chromium Carbide (CrC) alloy clad wear plates and pipes used for heavy materials...

VISIT SHOWROOM 
Industrial Nozzles & Systems (Pty) Ltd
Industrial Nozzles & Systems (Pty) Ltd

Industrial Nozzles & Systems (Pty) Ltd (Est. 2000) exclusive representative in Southern Africa for LECHLER GmbH (Est. 1879) - Europe's leading...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.054 0.887s - 149pq - 2rq
Subscribe Now