Thunder Horse south expansion project, Gulf of Mexico, US
Name and Location
Thunder Horse south expansion project, Gulf of Mexico, US.
Client
BP Exploration & Production.
Project Description
The Thunder Horse development consists of a semisubmersible production drilling quarters facility, with the capacity to produce 250 000 bbl/d of oil, and 200-million standard cubic feet a day of gas.
The processed oil and gas is transported to shore using BP-operated pipelines.
First oil was achieved in June 2008 and ramp-up to facility capacity was achieved within the first year of operation.
The expansion project involves the design, engineering, fabrication, installation and precommissioning of the new production pipeline systems.
Value
Not stated.
Duration
The offshore installation is expected to be performed in the second half of 2016.
Latest Developments
Technip has been awarded a lump-sum contract for the design, engineering, fabrication, installation and precommissioning of the new production pipeline systems on the south side of the Thunder Horse production drilling quarters unit.
The project scope includes project management and engineering; coating, fabrication, installation and permanent anchoring of two rigid production flowlines of 3.25 km each, with four pipeline end terminations; and precommissioning and testing.
Key Contracts and Suppliers
Technip (design, engineering, fabrication, installation and precommissioning of production pipeline systems).
On Budget and on Time?
Not stated.
Contact Details for Project Information
BP Exploration & Production media affairs tel +1 281 366 4463 or email press@bp.com.
Technip public relations, Laure Montcel, tel +33 1 49 01 87 81 or email press@technip.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation