https://www.engineeringnews.co.za

Tamarack nickel/copper/cobalt project, US

1st February 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Tamarack nickel/copper/cobalt project.

Location
Minnesota, in the US.

Client
Talon Metals.

Project Description
A preliminary economic assessment (PEA) has been completed.

The basis of design of the PEA has focused on a portion of the upper semimassive sulphide unit (SMSU), the lower SMSU and the massive sulphide unit (MSU). The study envisages a 1 390 t/d operation, producing 23.3-million pounds of nickel a year and 11.1-million pounds of copper over a seven-year mine life.

The PEA envisages the orebody being accessed through a 5-m-diameter shaft using transverse drift and fill for the MSU, and transverse open stoping for the SMSU.

Bulk rougher and scavenger flotation will be used followed by separate cleaning of the rougher and scavenger concentrates.

Bulk scavenger tailings will be treated in a desulphurisation stage to produce a low-mass, high-sulphur stream and high-mass, low-sulphur tailings. Filtered low sulphur tailings (at 80% to 85% solids content) will be co-disposed, with waste rock in a lined surface facility.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Using the PEA’s base case pricing and a dis­count rate of 7%, the project has a pretax net present value of $261-million and an internal rate of return of 44.6%, with a payback from the start of production of 1.9 years.

Value
An initial capital cost of $174.31-million.

Duration
Not stated.

Latest Developments
Talon has started a metallurgical test programme to simplify the initial PEA flowsheet.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Talon Metals president Sean Werger, tel +1416 500 9891 or email werger@talonmetals.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Rio-Carb
Rio-Carb

Rio Carb is an OEM (Original Equipment Manufacturer) of R-C700 Chromium Carbide (CrC) alloy clad wear plates and pipes used for heavy materials...

VISIT SHOWROOM 
Industrial Nozzles & Systems (Pty) Ltd
Industrial Nozzles & Systems (Pty) Ltd

Industrial Nozzles & Systems (Pty) Ltd (Est. 2000) exclusive representative in Southern Africa for LECHLER GmbH (Est. 1879) - Europe's leading...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.053 0.921s - 147pq - 2rq
Subscribe Now