Syama gold mine power station, Mali
Name of the Project
Syama gold mine power station.
Location
Mali.
Project Owner/s
Resolute Mining.
Project Description
The project involves the construction of a new hybrid modular power station at Resolute’s Syama mine, comprising solar, battery and thermal technologies.
The plant will provide improved environmental outcomes relative to existing power generation, including a significant reduction in carbon emissions.
The project will be completed in two stages.
Stage 1 includes the installation of three new thermal energy modular block generators and a battery storage system.
The modular blocks will be fuelled using refined heavy fuel and will be installed alongside the existing Syama thermal power plant to allow for the seamless transition to a new power solution.
The new modular block units will provide 30 MW of power and will incorporate an additional 10 MW Y-cube battery system.
Stage 2 will comprise the installation of an additional 10 MW modular block in 2022, and the construction of a 20 MW solar power system. Once the solar power system is installed, the 10 MW battery storage system will also manage the solar power contribution to the power system and smooth out fluctuation in solar output to facilitate integration into the hybrid system.
The solar system is planned to be built on the surface of the existing Syama tailings storage facility (TSF), thereby maximising positive environmental outcomes and augmenting Resolute’s rehabilitation programme.
Once fully operational, the power plant will reduce power costs by about 40%.
The new power plant will be modular and expandable to accommodate future mine growth.
The site includes space to accommodate an additional four 10 MW modular block units, enabling the mine to add additional power capacity if needed to support future growth.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Capital Expenditure
Not stated.
Planned Start/End Date
Stage 1 is expected to be fully operational by the end of 2020.
The timeline for the start of Stage 2 depends on the decommissioning of the existing TSF and is expected to be completed, at the latest, by 2023.
Latest Developments
None stated.
Key Contracts and Suppliers
Aggreko (funding and operation).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Resolute Mining, tel +61 8 9261 6100 or email contact@rml.com.au.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation