https://www.engineeringnews.co.za

South Korean fishing vessels install Vesconite Hilube stern tubes and rudder bearings

11th April 2017

     

Font size: - +

This article has been supplied as a media statement and is not written by Creamer Media. It may be available only for a limited time on this website.

Vesconite Hilube  (0.04 MB)

Two South Korean fishing vessels installed Vesconite Hilube stern tubes and rudder bearings at Port Louis dry dock, Mauritius, last month and the month before. The vessels, with a gross tonnage of 441t and 578t, came into the port separately, with a week’s interval between their entries.

It was determined that stern tube and rudder bearing replacement was required, and the vital hollow tube-like structures that connect the ship’s engine to the propeller and assist with steering as well as tubes that allow for the free movement of the rudder were ordered from Johannesburg, South Africa.

The one Vesconite Hilube bushing had an outer diameter of 225mm, an inner diameter of 170mm and a length of 250mm,  while another had an outer diameter of 155mm, an inner diameter of 75mm and a length of 400mm.

Other bushings, measuring 350mm x 250mm x 250mm and 350mm x 250mm x 1000mm, were also ordered.

“The repairer was happy that Vesconite Bearings’ Johannesburg warehouse was able to deliver the stern tubes and rudder bearings within a day of their being dispatched,” says technical consultant Eddie Swanepoel.

“The cost of a ship being in dry dock is considerable, as is the cost of lost fishing production, so delivery times of essential components is important,” he notes.

 

Port Louis, Mauritius

Edited by Creamer Media Reporter

Comments

Showroom

AutoX
AutoX

We are dedicated to business excellence and innovation.

VISIT SHOWROOM 
Environmental Assurance (Pty) Ltd.
Environmental Assurance (Pty) Ltd.

ENVASS is a customer and solutions-driven environmental consultancy with established divisions, serviced by highly qualified and experienced...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.071 0.124s - 158pq - 2rq
Subscribe Now