Rakkuri iron project, Sweden

15th March 2013

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Rakkuri iron project, Kiruna, Sweden.

Client
Hannans Rewards.

Project Description
The Rakkurijoki deposit has a Joint Ore Reserves Committee-compliant inferred resource of 74.5-million tons at 39.7% iron, using a cutoff grade set at 20% iron.

A scoping study completed on the deposit has confirmed the development potential of the project. The study assessed the potential of mining, processing, railing and shipping an iron product to the market in Europe or the Middle East North African region.

The mine will be an openpit operation, which will be staged in three pushbacks. Mining will entail a top-down, bench-by-bench method.  The mine will require a magnetic separation beneficiation plant with reverse flotation for the rejection of phosphorus and sulphur. The minimum life of the Rakkurijoki deposit is 12 years, but has the potential to be significantly increased with the inclusion of the Rakkurijärvi deposit, located 2.5 km south-west of Rakkurijoki. The two deposits will collectively be referred to as the Rakkuri iron project. The Rakkurijoki deposit is located less than 1 km from a modern, government-owned, open-access heavy-gauge rail line. The line connects the Rakkurijoki deposit to two modern iron-ore export ports – the Port of Lule, in Sweden, and the Port of Narvik, in Norway. The Rakkuri project will supply an iron fines product to only one of the ports.

Value
Initial capital costs to the Port of Lule are estimated at $629-million, or $679-million to the Port of Narvik.

Duration
Not stated.

Latest Developments
A decision has been made to initiate a prefeasibility study (PFS) on the Rakkurijoki deposit and to expand the PFS to include the Rakkurijärvi deposit. The amalgamation of the two deposits may further enhance the economics of the Rakkuri project, with relatively minimal additional capital expenditure. The PFS is expected to be completed by the first quarter of 2014.

A search has also begun for a joint venture partner to fund the PFS.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Hannans Rewards, tel +61 8 9324 3388, fax +61 8 9324 3366 or email admin@hannansreward.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Latest News

Showroom

Trotech
Trotech

Design, Construction and Maintenance of Site Erected, Welded Bulk Storage Tanks for the Petrochemical, LNG, Ammonia and Sustainable fuel Sectors.

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.11 1.003s - 147pq - 2rq
Subscribe Now