https://www.engineeringnews.co.za

Paulsens East iron-ore project, Australia

1st October 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Paulsens East iron-ore project.

Location
In the Pilbara, Western Australia.

Project Owner/s
Strike Resources.

Project Description
Paulsens East comprises a 3-km-long outcropping high-grade hematite ridge containing a Joint Ore Reserves Committee- (Jorc-) compliant indicated mineral resource of 9.6-million tonnes at 61.1% iron, 6% silicon dioxide, 3.6% aluminium oxide and 0.08% phosphorous (at a cutoff grade of 58% iron). The project has Jorc-compliant mineral reserves of 6.2-million tonnes grading 59.9% iron, 7.43% silicon oxide, 3.77% aluminium oxide and 0.086% phosphorous.

Strike proposes to adopt a phased approach to the start of mining at Paulsens East.

Stage 1 production will focus on surface detrital and low strip-ratio material of up to

400 000 t, to be shipped during 2022 through Utah Point at Port Hedland.

Stage 2 production is proposed at an annualised rate of 1.5-million to two-million tonnes a year, transitioning from Utah Point to the Port of Ashburton, in Onslow, which will reduce the trucking distance by 365 km. Ramp-up of this stage is expected to be substantially self-funded from Stage 1.


Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value of A$140-million and an internal rate of return of 213%.

Capital Expenditure
Initial capital expenditure for Stage 1 is estimated at A$5-million, with the remainder of the project expected to be funded from project cash flows. Total capital over the life-of-mine is estimated at A$15-million, inclusive of the A$5-million required in Stage 1.

Planned Start/End Date
First ore production is planned for late 2021 or early 2022, subject to a final investment decision.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Engenium (study management); Harry Warries, MSc – mine engineering, FAusIMM, – Mining Focus Consultants (mining schedule and Jorc probable ore reserve); Phillip Jones – BAppSc (Geol), MAIG, MAusIMM (Jorc mineral resources consultant); Engenium and Strike (capital and operating costs); Strike (logistics); Ecologia Environmental Consultants (environmental studies); Mark Hancock  – Haven Resources (marketing); and Strike (economic modelling).

Contact Details for Project Information
Strike Resources, tel +61 8 9214 9700 or email info@strikeresources.com.au.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ACTOM
ACTOM

Your one-stop global energy-solution partner

VISIT SHOWROOM 
ZF Aftermarket
ZF Aftermarket

ZF Aftermarket is the after-sales division of the world-renowned German ZF group, a global leader in mobility technology.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.055 1.033s - 158pq - 2rq
Subscribe Now