Paraguay river bridge, Paraguay and Argentina
Name of the Project
Paraguay river bridge.
Location
The bridge will ensure connectivity and mobility between the metropolitan area of Asunción, the region of Chaco, in Paraguay, and the border with Argentina.
Project Owner/s
Paraguay Ministry of Public Works and Communications.
Project Description
A feasibility has been completed on the proposed project.
The Paraguay river bridge will stimulate real estate development and facilitate the expansion of the urban and industrial area of greater Asunción on the right bank of the Paraguay river.
The feasibility study has proposed a 449-m-long bridge – with a cable-stayed deck attached to a double tower – with a main span of 260 m and equalising spans of 94.5 m. The cables will be fan-shaped, with the stays attached to both sides of the deck, anchored against a central column placed on the upper part of the two towers in the shape of a diamond. The project includes a proposed 7.4 km section of a newly reconstructed dual carriageway designed for speeds of 80 km/h. The carriageway comprises two roads each with two 3.5-m-wide lanes, a central reservation, a pavement for pedestrians and a cycle lane.
The viaduct is 2 500 m long, of which 449 m pertain to the bridge over the Paraguay river, while the remaining section refers to the access viaducts to the bridge.
A feasibility has also been completed to improve the section of the Bioceanic railway corridor between Cruce Centinela, Mariscal Estigarribia and Pozo Hondo, on the border between Paraguay and Argentina in the Department of Boquerón.
Potential Job Creation
Not stated.
Capital Expenditure
The Paraguay river bridge project is estimated at €140-million.
The Bioceanic railway corridor improvement project has a budget of €409-million.
Planned Start/End Date
Not stated.
Latest Developments
None stated.
Key Contracts and Suppliers
Acciona (feasibility study).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Paraguay Ministry of Public Works and Communications, tel +595 21 414 9000 or email vea@mopc.gov.py.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















