Panda Hill niobium project, Tanzania

24th April 2015

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Panda Hill niobium project, Tanzania.

Client
Cradle Resources.

Project Description
The prefeasibility study (PFS) completed on the Panda Hill project has confirmed a world-class niobium resource with excellent metallurgical recoveries.

The base case for the PFS is premised on an openpit mining operation, providing two-million tonnes a year of mill feed over a 30-year life-of-mine.

This is the same scale of operation that was considered in the scoping study and approximates to 8% to 10% of world production.

For this reason, and to simplify financing arrangements, the definitive feasibility study (DFS) will be scoped to achieve a more modest entry into the market, starting with a throughput of one-million tonnes a year.

The DFS will allow for production expansion as demand grows.

In the early years of production, the successive pit cutbacks will target the high-grade Angel zone, with further expansion targeting the medium-grade, but high-recovery, fresh sovite mineralisation to the north.

As the Panda Hill mineralisation is a relatively clean material with low levels of impurities, particularly uranium, tantalum and titanium, and well-liberated mineralisation at coarse grind, a single-stage flotation method can be used to process the niobium ore.

Net Present Value/Internal Rate of Return
The project has a post-tax net present value, at a 10% discount rate, of $470-million and an internal rate of return of 56%, with a payback of 1.5 years.

Value
The capital required for a two-million-tonne-a-year plant is estimated at $158-million, excluding preproduction and working capital costs.

This includes a 13% overall contingency.

Duration
Not stated.

Latest Developments
Work has started on the updated measured mineral resource for use in the DFS, with results expected in the second quarter of 2015.

Based on the results of the PFS, the DFS will consider the option of staging production so that, in the early years, a more capital efficient mining operation can be built that will target 5 000 t/y of ferroniobium – about 5% of world consumption.

The plant will then be expanded in subsequent years to achieve an increased production profile to meet growing demand from the ferroniobium market.

Key Contracts and Suppliers
SGS Canada (piloting of the milling and flotation circuit).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Cradle Resources, tel +61 8 9389 2000, fax +61 8 9389 2099 or email admin@cradleresources.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Axiom Hydraulics
Axiom Hydraulics

Axiom Hydraulics is a trusted leader in South Africa’s hydraulic industry, delivering world-class components, systems, and engineering expertise...

VISIT SHOWROOM 
Egoli Gas (Pty) Ltd
Egoli Gas (Pty) Ltd

As a reticulator, Egoli Gas provides natural gas to homes and businesses via underground pipes.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.059 1.059s - 147pq - 2rq
Subscribe Now