Nyanzaga gold project, Tanzania
Name of the Project
Nyanzaga gold project.
Location
The project is located in the Lake Victoria Goldfields region, in north-west Tanzania.
Client
The project is a joint venture between OreCorp and Acacia Mining.
OreCorp’s Tanzanian subsidiary has completed its earn-in obligations for the Nyanzaga gold project, and has exercised its option to gain full control of the project.
OreCorp has acquired a 25% stake in the project by spending about $14-million in completing a PFS and additional feasibility study-related work.
The company has also acquired an additional 26% interest from project partner Acacia Mining for $3-million, taking its interest to 51%.
This agreement is subject to approval from the Tanzanian Fair Competition Commission and the newly established Mining Commission.
OreCorp has also signed a binding conditional heads of agreement with Acacia and the joint venture vehicle Nyanzaga Mining Company to gain full ownership of the project by making a further $7-milion payment.
Acacia will retain a net smelter return royalty capped at $15-million, which will be paid at 1% with a gold price of less than $1 600/oz and at 2% with a gold price of more than $1 600/oz.
The acquisition of the additional 49% interest in Nyanzaga is also conditional on Tanzanian regulatory approvals, on the grant of a special mining licence for the project, and on the parties entering definitive documents for the acquisition.
Project Description
A prefeasibility study (PFS) on the Nyanzaga project has confirmed a robust project and has determined that a concurrent openpit (OP) and underground (UG) mine schedule represents the optimum mining sequence.
The OP will deliver the base load of mineralised material over the life-of-mine and is expected to deliver about 1.75-million ounces of contained gold over its 12-year mine life, an increase of 25%, or 350 000 oz of gold, on the scoping study assessment.
UG mining will start in Year 1, from a boxcut outside the OP, and is expected to produce about 1.16-million ounces of contained gold, including UG development material. The UG will be developed to a depth of 800 m below surface, with the deposit remaining open at depth. Detailed metallurgical testwork in the PFS has confirmed gold recovery of 88% through a conventional four-million-tonne-a-year carbon-in-leach processing plant, an increase of 3% on the scoping study figure.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Value
Preproduction capital costs are estimated at $287-million, which includes a $33-million contingency. The change in capital from the $248-million in the April 2016 scoping study is largely because of the change in the mine schedule resulting in an increased prestrip of 7.1-million tonnes, increasing the cost of the prestrip from $14-million to $36-million.
The process plant capital cost has increased by about $11-million, resulting from the reduced grind size (P80 of 75 μm, compared with P80 of 106 μm) and the inclusion of additional processing equipment to improve plant availability and operability. The higher initial capital cost, compared with the scoping study estimate, is offset by the increased average yearly life-of-mine (LoM) production and overall LoM ounces while retaining consistent capital intensity. Consistent with the scoping study, the capital estimate is based on a contractor mining scenario and, therefore, excludes capital for a mining fleet.
Duration
Not stated.
Latest Developments
A definitive feasibility study is currently under way.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
OreCorp, CEO and MD Matthew Yates, tel +61 0 417 953 315.
Acacia Mining, tel +44 207 129 7150 or fax +44 207 129 7180.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation