Muga potash project, Spain

15th January 2016

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Muga potash project, Spain.

Client
Highveld Resources.

Project Description
The Muga potash project has been optimised to enhance operational efficiencies, sales and marketing activities, and life-of-mine in preparation to start construction. Proven and probable ore reserves have increased from 146-million tonnes, at an average grade of 12.7% potassium oxide, to 253-million tonnes, with an average grade of 11.5%, an increase of 73% on the definitive feasibility
study.

The optimisation study has altered the mine plan to include:
– an additional sylvinite seam (Capa A), resulting in an increased mine life from 24 years to 47 years. This new mine plan excludes any potential upside from the substantial exploration target;
– a combination of continuous miners and road headers to increase productivity in production and infrastructure development;
– an increased number of main infrastructure galleries in the mine plan from one to three to reduce ramp-up risk and increase likely operational efficiency;
– increasing the size of:

  • the underground conveyor belt system to cater for an increase in underground tonnage and to enable better expansion options;
  • storage to enable more flexibility in smoothing grade profile to the processing plant;
  • the conveyor belt to surface in one decline to 1 500 t/h of material; and
  • the processing plant and its flexibility to deal with higher throughput of material;

– altering mine and process plant design to deliver a constant 90 000 t/m of granular K60 (1.08-million tonnes a year) for the balance of the revised 47-year mine life; and
– factoring in potential mine expansion into design to allow for seamless expansion of production in the future.

Similar to the DFS, the principal mining horizons will be accessed by two straight line declines, about 2.5 km and 2.6 km in length. The total cross-sectional area of each decline is 35.7 m2, a slight increase on the DFS number.

The declines will access the same mining horizon at two different points. The eastern decline reaches the mineralised horizon at 440 m below surface and the western decline at about 452 m below surface. Underground extraction will be by room-and-pillar mining using a combination of continuous miners and road headers to optimise extraction efficiency and selectivity in varying orebody heights. Additionally, continuous miners will be used for the ongoing mining development, including new transport drifts and main transport galleries.

Net Present Value/Internal Rate of Return
The optimisation study has increased the project’s net present value from $1.42-billion to $1.46-billion, at a 10% discount rate; and from $1.80-billion to $2.04-billion, at an 8% discount rate.

Value
Phase 1 capital expenditure in the optimisation study has increased
marginally from €249-million to €267-million.

Duration
The initial production targeted is scheduled for 2017.

Latest Developments
None stated.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Highveld Resources, tel +34 948 050 577 or fax +34 948 050 578.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ABB Electrification
ABB Electrification

Electrifying the world in a safe, smart, and sustainable way, ABB Electrification is a global technology leader in electrical distribution and...

VISIT SHOWROOM 
EKATO Africa
EKATO Africa

Established in 1933, EKATO is the world leader in agitation technology, supplying agitators for processes and applications such as chemicals and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.06 0.195s - 147pq - 2rq
Subscribe Now