Mackay sulphate of potash project, Australia
Name of the Project
Mackay sulphate of potash (SOP) project.
Location
The project covers the greater area of Lake Mackay, which is located in Western Australia.
Client
Agrimin.
Project Description
A scoping study on the Mackay SOP has confirmed the project’s potential to become a world-class SOP operation.
The project has indicated mineral resources of 4.3-million tonnes and inferred mineral resources of 18.9-million tonnes of SOP based on specific yield. These mineral resources have been defined to an average depth of 24.7 m. However, the study incorporates brine extraction from only the top 5.5 m of the deposit.
SOP production begins with pumping brine from trenches into a series of solar evaporation ponds. The project will dry-harvest crystallised potassium salts from the ponds. The process route entails flotation followed by crystallisation for SOP recovery.
The process plant has been designed for a production target of 370 000 t/y of SOP.
The key operating assumptions that underpin the production are target a brine production rate of 66.5 Gt/y over a 20-year mine life, at an average potassium concentration of 3.603 mg/l of brine, and an average overall potassium recovery of 69.3%. Pure SOP contains 44.87% potassium by weight.
SOP products will be transported in bulk by road to trains to a rail load-out facility in Alice Springs and then railed to one of the port options for shipment.
Jobs to be Created
Not stated.
Net Present Value/Internal Rate of Return
Not stated.
Value
The scoping study has estimated development capital at $259.4-million, including a 25% contingency on all direct and indirect line items.
Duration
Based on a final investment decision and securing financing, the project’s construction and ramp-up are estimated to take 24 months to reach full production.
Latest Developments
Agrimin has approved the progression to a prefeasibility study (PFS).
The company has started an infill drilling programme aimed at upgrading the indicated and inferred mineral resources in the study’s production plan to measured and indicated categories. The current field programme is also designed to provide key datasets for project permitting and the PFS.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Agrimin, tel +61 8 6141 6304 or email admin@agrimin.com.au.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation