La Colorada silver mine expansion project, Mexico

23rd September 2016

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name of the Project
La Colorada silver mine expansion project.

Location
Zacatecas, Mexico.

Client
Pan American Silver (PAS).

Project Description
La Colorada’s expansion project will be built progressively, ramping up from the current mining and processing rates of 1 250 t/d to 1 800 t/d by the end of 2017. Once the expansion is complete, La Colorada’s production capacity is estimated to grow 64% to about 7.7-million ounces of silver a year in 2018.

According to the preliminary economic assessment (PEA), the mine’s expansion will be achieved through the construction of new mining infrastructure, the development of new mining zones to reach deeper, higher-grade areas of mineralisation and the expansion of the sulphide ore processing plant.

A new 618-m-deep shaft will be built between the main Candelaria area that contains the NC2 and HW veins, and the Estrella area that contains the Amolillo vein using a highly efficient raiseboring technique. The new shaft will increase hoisting capacity to 2 300 t/d, accommodating ore and waste extraction, and serve as the main access to working areas for mine personnel and materials.

The new shaft will enable increased underground development rates to access additional mining areas, allowing for production rates to increase.

Mining at the Estrella and Candelaria areas will continue, using the cut-and-fill method.

The capacity of the ventilation and dewatering systems will be increased to handle the mine’s hot and wet ground conditions as mining operations extend at depth. The expansion plan also includes the addition of 22 new pieces of mining equipment to the fleet and the hiring of more than 100 additional mining personnel.

Total throughput at La Colorada’s processing plants will progressively increase from 1 250 t/d to 1 800 t/d by 2018. The mine currently produces doré bars from a conventional cyanide leach plant for the oxide ore, and silver-rich lead and zinc concentrates from a flotation plant that treats the sulphide ore. Both circuits currently share a single crushing plant. While the oxide plant will not be modified, owing to La Colorada’s oxide production remaining at current levels for the rest of the mine’s life, the sulphide plant will be expanded to treat the increased sulphide ore feed.

Expansion of the sulphide plant to 1 500 t/d will be implemented through the installation of a new crusher and grinding mill.

The existing zinc flotation cells will be converted to lead floatation and a new zinc floatation circuit will be built.

The plan also includes an upgrade and expansion of the plant’s dewatering circuits, and the installation of a new 115 kV power line connection to the national grid to replace the existing 33 kV lines.

Jobs to be created
Not stated.

Net Present Value/Internal Rate of Return
The PEA estimates an after-tax net present value of $38.6-million at a 10% discount rate, an estimated internal rate of return (IRR) of 22% and an estimated payback period of 2.5 years.

Value
Total capital expected to be invested at La Colorada for ongoing operations and the expansion project over the next four years is estimated at $163.8-million.

Duration
Construction of the Colorada expansion project started in 2014. The project was completed in the latter half of 2016.

Latest Developments
The new 618-m-deep shaft at the La Colorada mine was commissioned in full automatic mode in early September, ahead of schedule.

The shaft was built with zero lost-time accidents using raiseboring and shaft automation technologies.

PAS has said a new filter plant, power line and underground development, which forms part of the La Colorada expansion project, still need to be completed.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
The project is expected to be completed about 5% to 10% under budget.

Contact Details for Project Information
Pan American Silver, tel +1 604 684 1175, fax +1 604 684 0147 or email info@panamericansilver.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Axiom Hydraulics
Axiom Hydraulics

Axiom Hydraulics is a trusted leader in South Africa’s hydraulic industry, delivering world-class components, systems, and engineering expertise...

VISIT SHOWROOM 
Egoli Gas (Pty) Ltd
Egoli Gas (Pty) Ltd

As a reticulator, Egoli Gas provides natural gas to homes and businesses via underground pipes.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.052 1.293s - 148pq - 2rq
Subscribe Now