Kipoi copper project, Democratic Republic of Congo
Name and Location
Kipoi copper project, Democratic Republic of Congo (DRC).
Client
Tiger Resources.
Project Description
The Kipoi project covers 55 km2 and is located 75 km north-northwest of the city of Lubumbashi, in Katanga. The project contains a 12 km sequence of mineralised roan sediments that host at least five known deposits – Kipoi Central, Kipoi North, Kileba, Judeira and Kaminafitwe.
Joint Ore Reserves Committee-compliant resources have been reported at three of the deposits. The principal deposit is Kipoi Central, which contains a zone of high-grade copper mineralisation within a much larger, lower-grade global resource.
Tiger is following a phased development approach for the project.
The first stage of production allowed for the treatment of only high-grade oxide material (malachite) through a heavy-media separation (HMS) plant.
The HMS plant was wound down in the September 2014 quarter and superseded by the solvent extraction electrowinning (SX-EW) plant, which produced first cathode in May 2014 and reached nameplate production of 25 000 t/y in September 2014. The SX-EW facility will produce LME grade-A copper cathode directly at the mine site.
The SX-EW plant can potentially be expanded to 32 500 t/y.
It is envisaged that ore from the Judeira deposit, and other deposits within the Kipoi project area and the nearby 100%-owned Lupoto project, will also be processed during Stage 2 operations, providing additional returns and increasing the mineral resources available as feedstock to the Stage 2 SX-EW plant. Increased resources will potentially increase the nine-year mine life demonstrated in the feasibility study and/or the yearly plant throughput.
Net Present Value/Internal Rate of Return
Not stated.
Value
The SX-EW Phase 2 expansion is budgeted at an estimated $25-million.
Duration
The debottlenecking works are expected to be completed in the fourth quarter of 2016, with full increased capacity expected in 2017.
Latest Developments
Growing global demand for cobalt has prompted Tiger Resources to examine the possibility of converting its resources at the Kipoi mine to a saleable product.
Tiger has commissioned a study by independent consultant Mintrex to investigate the economic viability of producing cobalt at Kipoi.
The study is expected to be completed by the fourth quarter of this year.
Tiger has a measured and indicated cobalt resource of 40 400 t and an inferred resource of 5 600 t across the Kipoi Central, Kipoi North, Kileba and Judeira deposits at the Kipoi project. There are also additional cobalt resources at the nearby Sase Central deposit, where Tiger has defined an indicated cobalt resource of 5 000 t and an inferred resource of 1 000 t.
Tiger currently produces about 26 000 t/y of copper cathode from the Kipoi project and is undertaking debottlenecking works at the plant to increase production capacity to 32 500 t/y.
Key Contracts and Suppliers
MCK Mining (mining contract – Stage 1); DRA Mineral Projects (lump-sum turnkey contract for the design, installation and commissioning of the HMS – Stage 1); Group Five (subcontractor – construction works for Stage 1); Arccon Mining Services (scoping study); Cube Consulting (pit optimisations); Coffey Mining (tailings dam – design and costing) and Senet (SX-EW plant).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Tiger Resources investor relations, Nathan Ryan, tel +61 420 582 887 or email nryan@tigerez.com.
DRA Mineral Projects, tel +27 11 202 8600, fax +27 11 202 8807 or email dra@drasa.co.za.
Group Five, tel +27 11 806 0111, fax +27 11 803 5520 or email info@groupfive.co.za.
Arccon Mining Services, tel +61 8 9340 6100, fax +61 8 9340 6150 or email mining@arccon.com.au.
Cube Consulting (South Africa), tel +27 12 665 2154, fax +27 27 665 1176 or email highveld@cubeconsulting.com.
Coffey Mining (South Africa), tel +27 11 679 3331 or fax +27 11 679 3272.
Senet, tel +27 11 409 1300 or fax +27 11 409 1301.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation