Kipoi copper project, Democratic Republic of Congo
Name and Location
Kipoi copper project, Democratic Republic of Congo (DRC).
Client
Tiger Resources (60%) and La Générale des Carrière et des Mines (40%).
Project Description
The Kipoi project covers 55 km2 and is located 75 km north-north-west of the city of Lubumbashi, in Katanga. The project contains a 12 km sequence of mineralised roan sediments that host at least five known deposits – Kipoi Central, Kipoi North, Kileba, Judeira and Kaminafitwe.
Joint Ore Reserves Committee-compliant resources have been reported at three of the deposits. The principal deposit is Kipoi Central, which contains a zone of high-grade copper mineralisation within a much larger, lower-grade global resource.
Tiger is taking a phased development approach at the project.
The high-grade zone of copper mineralisation at Kipoi Central is being exploited during the Stage 1 development. During the three-year operation of Stage 1, an estimated 900 000 t/y of 7% copper is planned to be processed through the heavy-media separation (HMS) plant, with a recovery rate of 55% to produce 132 000 t of copper in concentrate over its 42-month life.
The existing infrastructure at Kipoi for the Stage 1 HMS facility will be a springboard for the development of the Stage 2 solvent extraction electrowinning (SX-EW) plant, thereby minimising costs for the Stage 2 development. It is envisaged that ore from the Judeira deposit, and other deposits within the Kipoi project area and the nearby 100%-owned Lupoto project, will also be processed during the Stage 2 operations, providing additional returns and increasing the mineral resources available as feedstock to the Stage 2 SX-EW plant. Increased resources will potentially increase the nine-year mine life, demonstrated in the feasibility study and/or yearly plant throughput.
The HMS plant is producing more than 36 000 t/y of copper in a 25% concentrate. After a short period, during which the HMS and SX-EW facilities will operate simultaneously, the HMS will be superseded in the second quarter of 2014 by the SX-EW plant, which will produce London Metal Exchange grade-A copper cathode directly at the mine site.
The SX-EW plant is expected to produce 25 000 t in its first full year of operation and 50 000 t in subsequent years.
Value
Stage 1 cost an estimated $30-million.
Stage 2 will cost $160.9-million.
Duration
The Stage 2 SX-EW plant is scheduled to come on stream in 2014.
Latest Developments
Tiger reached commercial copper cathode production at its Stage 2 SX-EW plant, at the Kipoi project, in July.
Tiger produced 1 501 t of copper cathode, operating at 72% of the 25 000 t/y nameplate capacity. For commercial production to be reached within six weeks of startup is a significant achievement, as it can often take more than six months to bring an SX-EW plant to full production.
The plant is expected to produce about 14 000 t of copper cathode in this calendar year and a further 25 000 t of cathode in the first full 12 months of production.
Key Contracts and Suppliers
MCK Mining (mining contract – Stage 1), DRA Mineral Projects (lump-sum turnkey contract for the design, installation and commissioning of the HMS – Stage 1), Group Five (subcontractor – construction works for Stage 1), Arccon Mining Services (scoping study), Cube Consulting (pit optimisations), Coffey Mining (tailings dam – design and costing) and Senet (SX-EW).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Tiger Resources, tel +61 8 9240 1933, fax +61 8 9240 2406 or email tiger@tigerez.com.
DRA Mineral Projects, tel +27 11 202 8600, fax +27 11 202 8807 or email dra@drasa.co.za.
Group Five, tel +27 11 806 0111, fax +27 11 803 5520 or email info@groupfive.co.za.
Arccon Mining Services, tel +61 8 9340 6100, fax +61 8 9340 6150 or email mining@arccon.com.au.
Cube Consulting (South Africa), tel +27 12 665 2154, fax +27 27 665 1176 or email highveld@cubeconsulting.com.
Coffey Mining (South Africa), tel +27 11 679 3331 or +27 11 679 3272.
Senet, tel +2711 409 1300 or fax +2711 409 1301.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation