Name of the Project
Kathleen Valley lithium/tantalum project.

Location
The project is located in the Eastern Goldfields of Western Australia.

Project Owner/s
Liontown Resources.

Project Description
Kathleen Valley has an ore reserve estimate of 71-million tonnes at 1.4% lithium oxide and 130 parts per million tantalum pentoxide, underpinning an initial 40-year mine life.

The prefeasibility study (PFS) envisages the establishment of a two-million-tonne-a-year mining and whole-of-ore flotation processing operation delivering 350 000 t/y of spodumene concentrate, or SC6.0, at a grade of 6% lithium oxide and 430 t/y of 30% grade tantalum concentrate.

The PFS includes a 4.4 MW solar array to supplement plant power requirements.

The PFS design includes key capital considerations on the initial mine and the processing plant to allow for a throughput expansion to four-million tonnes a year, with negligible future operational impact on the base case presented.

Potential Job Creation
None stated.

Net Present Value/Internal Rate of Return
The project has a post-tax net present value, at an 8% discount rate, of A$1.12-billion and an internal rate of return of 37%, with a payback of three years.

Capital Expenditure
The project has a capital cost of A$325-million, including A$67-million in preproduction costs.

Planned Start/End Date
First production is expected to start in the first quarter of 2025.

Latest Developments
Liontown Resources will raise A$12.5-million through a share placement to institutional and professional investors to advance its Kathleen Valley lithium/tantalum project, and its Moora gold/platinum, nickel/copper projects, in Western Australia.

The company said in October that more than 44.9-million shares would be issued, at 23c a share, under the company’s existing placement capacity to raise an initial A$10.33-million.

A further 9.4-million shares will be placed to the company’s directors, subject to shareholder approval, to raise a further A$2.17-million.

The issue price represents a 13.2% discount to Liontown’s last closing price on October 26.

Key Contracts, Suppliers and Consultants
Optiro (geology and mineral resource estimate); Orelogy Consulting (mine optimisation, planning, design and scheduling); ALS Metallurgy (process testwork); Lycopodium Minerals (process and infrastructure design, capital expenditure and operating expenditure); Knight Piésold (tailings and hydrogeology); MBS Environmental (environmental studies); Peter O’Bryan and Associates (geomechanical engineering).

Contact Details for Project Information
Liontown Resources, tel +61 8 9322 7431 or email info@ltresources.com.au.

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Aluminium Federation of South Africa
Aluminium Federation of South Africa

The Aluminium Federation of South Africa (AFSA), is the voice of the South African aluminium industry.

VISIT SHOWROOM 
Rittal
Rittal

Rittal is a world leading provider of top-quality integrated systems for enclosures, power distribution, climate control, IT infrastructure and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.076 0.761s - 147pq - 2rq
Subscribe Now