Hinkley Point C nuclear power plant project, UK

25th October 2013

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Hinkley Point C nuclear power plant project, UK.

Client
EDF Energy.

Project Description
The project will involve the construction, operation and maintenance of a new nuclear power station, known as Hinkley Point C, on a site to the west of the existing Hinkley Point A and B power stations, in West Somerset.

The development will include two UK European pressurised water reactors, associated buildings and a plant; staff facilities, offices, workshops and storage buildings; cooling water tunnels and associated infrastructure, including a fish recovery and return system; fuel and management facilities, including for spent fuel and intermediate waste; a sea wall, incorporating a public footpath; a national-grid 400 kV substation and overhead power lines on site; a public information centre; a temporary jetty; an emergency access road; access and parking facilities for workers, visitors and deliveries; and a temporary accommodation campus, including 510 bed spaces. The new power plant will be capable of generating up to 3 260 MW. The power station is expected to operate for about 60 years.

Value
£16-billion.

Duration
Commissioning of the new plant is scheduled for 2018.

Latest Developments
EDF and the British government have signed an agreement to build two nuclear reactors for a total cost of £16-billion.

EDF will have a 45% to 50% stake in the consortium to build two Areva-designed EPR reactors at Hinkley.

China General Nuclear Corporation (CGN) and China National Nuclear Corporation (CNNC) will have a combined stake of 30% to 40%, while Areva will take a 10% stake.

Discussions are also under way with regard to compiling a shortlist of other interested parties that can take up to 15%, EDF has said.

The contract will last for 35 years from the date of commissioning, with an electricity price set at £92.5/MWh, or £89.5/MWh if a second nuclear plant project at Sizewell goes ahead.

Key Contracts and Suppliers
Kier BAM joint venture (site preparation works) and Bouygues TP/Laing O’Rourke joint venture (civils work contract).

On Budget and on Time?
Not stated.

Contact Details for Project Information
EDF Energy, John Levy, tel +44 207 752 2265.
Kier BAM joint venture, tel +44 1767 640111, fax +44 1767 640002 or
email info@kier.co.uk.
Matthew Moth at the Madano Partnership on behalf of the Bouygues TP/Laing O’Rourke joint venture, tel +44 207 593 4000 or email matthew.moth@madano.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Vikela Aluvin (Pty) Ltd
Vikela Aluvin (Pty) Ltd

Complete range of security sealing solutions including security seals bags and labels.

VISIT SHOWROOM 
CSIR International Convention Centre (CSIR ICC)
CSIR International Convention Centre (CSIR ICC)

CSIR International Convention Centre (CSIR ICC) - the leading conference and events venue in Pretoria/Tshwane.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.054 0.904s - 145pq - 2rq
Subscribe Now