https://www.engineeringnews.co.za

Grassy Mountain gold project, US

2nd October 2020

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Grassy Mountain gold project.

Location
The project is located in eastern Oregon, in the US.

Project Owner/s
Paramount Gold.

Project Description
A feasibility study has outlined an underground mining operation with exceptional economic viability yielding strong net present value (NPV) and internal rate of return (IRR) results.

The project has measured and indicated resources of 28.03-million grading 1.17 g/t gold and 3.67 g/t silver. Proven and probable reserves are estimated 1.73-million grading 6.82 g/t gold and 9.94 g/t silver.

Envisaged is an operation with an initial eight-year mine life, producing 362 000 oz of gold and 425 000 oz of silver.

The mine plan has been developed using a drift-and-fill underhand mining method.

Processing from the upper portion of the mine is expected to start concurrently with the completion of the processing plant and infrastructure. Following ramp up, the mine is expected to produce an average of 1 300 t/d to 1 400 t/d, four days a week, which will provide enough material for the 750 t/d mill and processing plant to operate at full capacity for seven days a week.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value (NPV), at a 5% discount rate, of $123-million and an internal rate of return of 27.9%, which increases significantly to an NPV of $238-million and an IRR of 44.7% at $1 900/oz.

Capital Expenditure
The project as initial capital costs of $97.5-million.

Planned Start/End Date
Not stated.

Latest Developments
None stated.

Key Contracts, Suppliers and Consultants
Ausenco Engineering Canada (feasibility study – processing and infrastructure design, as well as overseeing the metallurgical testing) and Mine Development Associates (feasibility study – mineral resource estimate, mine planning and reserves estimation); Golder Associates (tailings storage facility); and EM Strategies (overseeing all environmental aspects of feasibility study).

Contact Details for Project Information
Paramount Gold, tel +1 866 481 2233 or email info@paramountnevada.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Rio-Carb
Rio-Carb

Rio Carb is an OEM (Original Equipment Manufacturer) of R-C700 Chromium Carbide (CrC) alloy clad wear plates and pipes used for heavy materials...

VISIT SHOWROOM 
Industrial Nozzles & Systems (Pty) Ltd
Industrial Nozzles & Systems (Pty) Ltd

Industrial Nozzles & Systems (Pty) Ltd (Est. 2000) exclusive representative in Southern Africa for LECHLER GmbH (Est. 1879) - Europe's leading...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.059 0.913s - 145pq - 2rq
Subscribe Now