https://www.engineeringnews.co.za

Golpu gold project, Papua New Guinea

11th March 2016

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Golpu gold project, Papua New Guinea (PNG).

Client
Wafi-Golpu Joint Venture, comprising Harmony and Newcrest Mining, each with a 50% stake in the project.

The PNG government retains the right to buy its pro rata share of historical costs, up to a 30% equity interest in any mineral discovery at the project at any time before the start of mining.

If government decides to take up its full 30% interest, Newcrest and Harmony’s shares will both decrease to 35% each.

Project Description
The Golpu project has a reserve estimated to contain 5.5-million ounces of gold and 2.4-million tonnes of copper.

A Stage 1 feasibility study and a Stage 2 prefeasibility study (PFS) on the project have confirmed a robust investment case – one that supports proceeding with the project.

Both studies indicate that the project is amenable to staged development.

The Stage 1 feasibility study justifies the development of twin exploration declines, with two proposed block caves designed to extract about 50% of the contained copper and gold metal of the Golpu reserve.

The remaining reserve is expected to be extracted by a deeper block cave below Block Cave 2 (BC2), in Stage 2.

The common path mining and processing infrastructure of Stage 1 will be used in the development of Stage 2.

Net Present Value/Internal Rate of Return
The Stage 1 feasibility has an estimated net present value of $1.1-billion and an internal rate of return of about 16%.

Value
Stage 1 capital on a 100% basis is estimated at $2.6-billion.

Duration
Not stated.

Latest Developments
The project will progress into execution only when a special mining lease is granted, which will include all necessary permits, approvals and consents required from the PNG government, landowners and relevant stakeholders.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Newcrest Mining, tel +61 3 9522 5333, fax +61 3 9525 2996 or email corporateaffairs@newcrest.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ACTOM
ACTOM

Your one-stop global energy-solution partner

VISIT SHOWROOM 
WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.055 0.999s - 147pq - 2rq
Subscribe Now