Name of the Mine
Efemçukuru mine.

Location  
Izmir province in western Türkiye.

Mine Owner/s  
Eldorado Gold.

Brief Description  
Efemçukuru is a high-grade, underground operation, which uses a flotation circuit to produce a gold concentrate.

Brief History  
Eldorado Gold received an environmental positive certificate for the Efemçukuru mine in 2006. A feasibility study was completed a year later. Site preparation activities started in 2008. Commercial production at the mine was achieved in December 2011.

Primary Metals/Minerals  
Gold.

Secondary Metals/Minerals  
None stated.

Geology/Mineralisation  
Eldorado Gold defines Efemçukuru as an intermediate sulphidation epithermal gold deposit hosted within Upper Cretaceous phyllite and schist at the western end of the Izmir-Ankara Suture Zone.

Vein mineralogy is variable but primarily comprises quartz, rhodonite that is commonly replaced by rhodochrosite, adularia and sulphide assemblages, including pyrite, galena, chalcopyrite and sphalerite.

Spectacular, high-grade banded crustiform-colloform textures exemplify the veins in addition to multistage breccias, which were likely the result of shallow-level boiling.

Most of the gold is very fine (2.5 μm to 50 μm), occurring as free grains in quartz and carbonate, and as inclusions in sulphide minerals. Lower-grade mineralised stockworks occur peripheral to the ore shoots, and are most strongly developed in hangingwall rocks.

Reserves  
Total proven and probable reserves as at September 30, 2021, were estimated at 3.4-million tonnes grading 1.7 g/t gold.

Resources  
Total measured and indicated resources as at September 30, 2021, were estimated at 4.6-million tonnes grading 7.2 g/t gold. Inferred resources were estimated at 3.3-million tonnes grading 5.9 g/t gold.

Mining Method  
Underground using drift-and-fill and longhole open stoping.

Major Infrastructure/Equipment  
The Efemçukuru mine comprises an underground mine with a process plant and ancillary facilities on surface situated south-west of Izmir in an area easily accessible by road.

The surface infrastructure at the mine includes site access and plant site roads, water treatment, supply and distribution facilities, sewage collection and disposal, diesel fuel storage, power supply and distribution facilities and, auxiliary facilities.

Prospects  
Opportunities exist to extend the life-of-mine at the Efemçukuru mine through the conversion of high-grade inferred resources and the testing of new targets with the Kokarpinar and Kestane Beleni vein system.

Contact Details
Eldorado Gold
tel +1 604 601 6650,
website http://www.elodradogold.com.

Sources
Eldorado Gold. Technical report for Efemçukuru gold mine, Türkiye (December 31, 2019).
Eldorado Gold. Investor presentation (August 2022).
Eldorado Gold. Website: https://www.eldoradogold.com/ [accessed August 8, 2022].

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

Environmental Impact Management Services
Environmental Impact Management Services

EIMS is an independent specialised environmental consulting firm offering the full spectrum of environmental management services across all sectors...

VISIT SHOWROOM 
Craig Miller Technical Services (CMTS)
Craig Miller Technical Services (CMTS)

CMTS is a leading, well-established EC&I contractor with 37+ years of mining and industrial experience. We execute full-scope EC&I projects with...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.049 1.26s - 148pq - 2rq
Subscribe Now