https://www.engineeringnews.co.za

Booysendal North mine expansion to add 30 000 oz/y

INCREASING OUNCES
The project is expected to increase North mine yearly production to 190 000 oz

INCREASING OUNCES The project is expected to increase North mine yearly production to 190 000 oz

16th December 2016

By: Simone Liedtke

Creamer Media Social Media Editor & Senior Writer

  

Font size: - +

The deepening of platinum producer Northam Platinum’s Booysendal North upper group two (UG2) mine is expected to add 30 000 oz/y of saleable 4E (platinum, palladium, rhodium and gold) product to the Booysendal mine when completed in 2018.

The project, which started shortly after approval in November 2015, is an expansion of the Booysendal North mine, which came on stream in 2013 and reached steady-state production of 160 000 oz/y at the end of 2015. The project is expected to increase the North mine’s yearly production to 190 000 oz.

The UG2 Booysendal North mine has been developed as a mechanised room-and-pillar operation.
The main underground infrastructure comprises a reverse decline system consisting of two barrels, excluding the Merensky reef access barrel. The main barrel contains the conveyor belt and chairlift to transfer rock and personnel. The other barrel is for the movement of mechanised equipment into and out of the mine, according to Northam’s website.

Further, the company says the design of the footwall decline is unique to Booysendal and is placed about 24 m below the reef horizon. This decline is connected to the reverse decline and contains the conveyor and chairlift for the conveyance of rock and personnel respectively.

Northam describes the deepening project, which involves the addition of two extra mining levels and four new production sections, as a logical, capital-efficient extension of the original Booysendal footprint.

The conveyor-decline cluster for this R270-million three-year project was already on reef and would, thus, offer an immediate payback element, Northam told Mining Weekly in October.

A key component to the extension is the construction of a 5 000 t surge capacity underground silo that will connect the deeper, new section to the existing mine.

However, the silo will also decouple these two parts to ensure continuous mining during unexpected stoppages.

Northam is also undertaking the Merensky Phase 1 project at Booysendal North. Thus far, R75-million has been spent on the R300-million two-year project, which is expected to produce about 25 000 oz/y.

The project is scheduled to be completed in 2018, with infrastructure having already been established for initial mining. This is to be followed by the development of a decline system to allow for additional mining sections to be established if needed and to provide swing production.

Edited by Tracy Klückow
Creamer Media Contributing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Axiom Hydraulics
Axiom Hydraulics

Axiom Hydraulics is a trusted leader in South Africa’s hydraulic industry, delivering world-class components, systems, and engineering expertise...

VISIT SHOWROOM 
Egoli Gas (Pty) Ltd
Egoli Gas (Pty) Ltd

As a reticulator, Egoli Gas provides natural gas to homes and businesses via underground pipes.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.043 0.869s - 122pq - 2rq
Subscribe Now