Araguaia ferronickel project, Brazil

6th September 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Araguaia ferronickel project.

Location
Pará state, Brazil.

Project Owner/s
Horizonte Minerals.

Project Description
A feasibility study has confirmed Araguaia as a Tier 1 project with a large high-grade scalable resource, long mine life and low-cost source of ferronickel for the stainless steel industry.

The project has two principal mining centres – Araguaia nickel south (ANS) and Araguaia nickel north (ANN). ANS hosts the Pequizeiro, Baiao, Pequizeiro West, Jacutinga, Vila Oito East, Vila Oito West and Vila Oito deposits, while ANN hosts the Vale do Sonhos deposit.

The feasibility study envisages an openpit nickel laterite mining operation that delivers ore from several pits to a central rotary kiln electric furnace (RKEF) metallurgical processing facility.


The deposits will be mined by contractors using conventional openpit truck-and-shovel techniques. No blasting will be necessary. Reverse circulation grade-control drilling will be completed at a 10 m × 10 m spacing, well ahead of mining. This, combined with the use of visual control of the limonite and transition boundary, face sampling, stockpile sampling and ore feed sampling, supports a comprehensive mine-to-mill strategy that is designed to maintain consistent feed to the process plant.

Waste will be stored in external dumps near the pits. Ore will be transported to stockpile hubs near each deposit. Sheeting (using ferricrete extracted from the overburden) will be required to support trafficability in and around the mine during the wet season. Depending on plant demand, ore will be hauled from hub stockpiles or directly from the pits to the run-of-mine (RoM) at the RKEF process facility. Stockpiles on the RoM will be sheeted and classified according to ore type and chemistry for blending.

After an initial ramp-up period, the plant will reach full capacity of about 900 000 t/y of dry ore feed to produce 52 000 t/y of ferronickel containing 14 500 t/y of nickel.

The project has an initial 28-year mine life.

Araguaia’s feasibility study design allows for the future construction of a second RKEF process line, with potential to double Araguaia’s production capacity from 14 500 t/y to 29 000 t/y of nickel.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an estimated post-tax net present value, at an 8% discount rate, of $401-million and internal rate of return of 20.1%.

Capital Expenditure
The project has a capital cost of $443-million, including $65.3-million in contingencies.

Planned Start/End Date
The RKEF plant and project infrastructure will be built over a 31-month period.

The company aims to start production in late 2021 or early 2022.

Latest Developments
Horizonte Minerals has signed a royalty agreement with Orion Mine Finance that will provide it with an upfront cash payment of $25-million for the development of the Araguaia ferronickel project.

Orion will have a 2.25% royalty on the first 426 429 t of contained nickel within the final product (ferronickel) produced and sold. This is equivalent to the nickel production estimated over the life-of-mine for Araguaia in the Stage 1 feasibility study.

The royalty agreement will enable the company to build out its owner's team, advance engineering and early works packages as it proceedes to the start of full construction at the mine.

Key Contracts and Suppliers
Ausenco Engineering Canada (process plant design).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
Horizone Minerals, tel +44 203 356 2901.
Tavistock on behalf of Horizone Minerals, tel +44 207 920 3150 or email horizonte@tavistock.co.uk.

 

 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Latest News

Showroom

Trotech
Trotech

Design, Construction and Maintenance of Site Erected, Welded Bulk Storage Tanks for the Petrochemical, LNG, Ammonia and Sustainable fuel Sectors.

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.069 0.878s - 147pq - 2rq
Subscribe Now