Waterberg coal project (WCP), Limpopo, South Africa.

Client
The Waterberg Coal Company (WCC) and its controlled entity Firestone Energy, collectively forming the Waterberg Energy Group (WEG), have a combined 70% interest in the WCP.

Project Description
The WCP currently has identified coal resources of 3.883-billion tonnes of coal.

The WEG commissioned a definitive feasibility study (DFS) in mid-2012 for the proposed development of an opencast mining operation to produce ten-million tonnes a year of coal for State-owned power utility Eskom, predicated on a memorandum of understanding (MoU) entered into with Eskom in March 2012. 

The Eskom project DFS reviewed the design, manufacture, supply, delivery, assembly, installation and commissioning of a 220-million-tonne-a-year coal-handling and preparation plant in a phased approach within an engineering, procurement and construction framework.

The preliminary results of the Eskom project DFS were delivered in mid-2014 to WEG. Since then WEG has been engaged in a optimisation exercise to enhance the overall economic and capital efficiency of the project, while engaging with Eskom to finalise the outstanding issues, which include, besides others, coal specification, final pricing, delivery dates and providing Eskom with a satisfactory due diligence report on the DFS.

Arising from the Eskom technical and economic study, WEG has also recently completed a DFS for the export development project through which it intends to mine high-grade coal for export.

Additionally, WEG is well advanced with its independent power producer (IPP) strategy, which it expects will form a significant part of the overall development plan going forward.  

The economic thesis for the Eskom project and the WEG export project is based on the vast in situ coal resources as confirmed by the resource statement emanating from the competent persons report, dated September 24, 2014, from Gemecs. The confirmed resources now underpin:
• the proposed production and delivery of export-quality coal product for the international market for up to four-million tonnes a year;
• the proposed production and delivery of coal product to Eskom and
local IPPs.

The first two target markets are being addressed through two separate and distinct projects and operations, while the production of low-calorific-value coal is the resulting by-product emanating from the export project and the Eskom project that will be used to supply the IPP.

With the technical and economic studies now completed, it is considered that the Waterberg project can significantly increase coal production from the confirmed resource base in a cost-effective manner to become one of the largest independent suppliers of power generation to the South African market. 

Net Present Value/Internal Rate of Return
Not stated.

Value
Accruing from the DFS for the export project, a capital requirement of $150-million has been identified.

Duration
WEG is targeting a project start-up for the export project towards the end of the fourth quarter of 2015, with a target of first coal to market in the first quarter of 2017.

Latest Developments
Recently WEG entered into an agreement with the Lephalale Municipal Council to take over the management and operation of the Paarl wastewater treatment plant to supply water to the WCP.

The agreement is a significant step towards the development of the WCP.

The plant has a treatment capacity of ten-million litres a day, or 3.64-million cubic metres a year, which will provide the WCP with sufficient water not only for its proposed export project development but also Stage 1 of its proposed IPP development that is currently under technical and economic assessment.

Key Contracts and Suppliers
SRK Consulting (feasibility study); Coffey Mining (geotechnical investigation) and Ardbel, an ELB Engineering Services and DRA Group joint venture (preliminary design and basic engineering works); and Gemecs (competent persons report).

On Budget and on Time?
Not stated.

Contact Details for Project Information
WCC, tel +27 10 594 2240, fax +27 10 594 2253 or email info@waterbergcoal.net.
SRK Consulting, tel +27 11 441 1111, fax +27 11 880 8086 or email johannesburg@srk.co.za.
Coffey Mining, tel +27 11 679 3331, fax +27 11 679 3272 or email Coffey.Africa@coffey.com.
Ardbel, tel +27 11 032 1150 or email info@ardbel.com.
Gemecs, tel +27 11 431 2327 or fax +27 11 388 5243.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Showroom

The Beneficiation Academy
The Beneficiation Academy

The Beneficiation Academy is a certified training institution that follows all compliance legislation and is accredited with various Sector...

VISIT SHOWROOM 
Sulzer Pumps (SA) (Pty) Ltd
Sulzer Pumps (SA) (Pty) Ltd

Sulzer South Africa, established in 1922, partners with critical industries like power, oil & gas, water, mining, and chemicals to boost...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.052 0.804s - 148pq - 2rq
Subscribe Now