VC Summer nuclear power station expansion, US
Name and Location
VC Summer nuclear power station expansion, South Carolina, US.
Client
South Carolina Electric & Gas Company (SCE&G), a subsidiary of Scana Corporation.
Project Description
The project involves the construction of two new nuclear units, located at the VC Summer nuclear power station site near Jenkinsville, in South Carolina.
The two new 1 117 MWe Westinghouse advanced pressurised water reactor, or AP1000s, will share a site with an existing pressurised water reactor that has been in operation since 1984.
The AP1000 has 85% less cable, 80% less pipe, 50% fewer valves and 35% fewer pumps than the current generation of reactors.
Value
Not stated.
Duration
The first unit is scheduled for commercial operation in 2017 and the second in 2018.
Latest Developments
The pouring of the first concrete – the recognised event by which construction on a new reactor is deemed to be officially under way – was completed on March 11, 2013.
The basemat provides a foundation for the containment and auxiliary buildings that are within the nuclear island. Measuring 1.83 m in thickness, the basemat required an estimated 5 350 cubic metres of concrete to cover an area about 76 m long and 49 m wide.
Key Contracts and Suppliers
None stated.
On Budget and on Time?
Not stated.
Contact Details for Project Information
Scana media contact Rhonda O’ Banion, tel +1 800 562 9308 or email Rhonda.obanion@scana.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation















