Upper Lillooet hydro project, Canada

21st March 2014

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Upper Lillooet hydro project, British Colombia, Canada.

Client
Creek Power, a joint venture between Innergex Renewable Energy (66.6%) and Ledcor Power Group (33%).

Project Description
The project includes two run-of-river, clean energy generation facilities – the 81.4 MW Upper Lillooet river hydroelectric facility and the 25.3 MW Boulder (Pebble) Creek hydroelectric facility – located in the Pemberton Valley.

Each hydroelectric facility will divert partial flows from the river or creek through an intake structure directly into a tunnel and/or penstock to the turbine(s) and generating equipment, located in each powerhouse. The water will then be returned to each river/creek.

Electricity generated by the hydroelectric facilities will be transmitted by a single 230 kV transmission line, which will be built to connect the hydroelectric facilities to the BC Hydro transmission system. The transmission line route does not pass through Pemberton.

The project initially included three run-of-river facilities – the Upper Lillooet river, Boulder Creek and North Creek – with a combined capacity of 121 MW. In March 2013, Creek Power announced changes to the configuration of the project, which included the proposed cancellation of the North Creek facility.

Value
Not stated.

Duration
Construction of the 25.3 MW Boulder Creek facility was expected to start in 2013 and the project is expected to reach commercial operation in 2015. Construction of the 81.4 MW Upper Lillooet river facility is expected to start in 2013, with the project expected to reach commercial operation in 2016.

Latest Developments
Discussions are ongoing with BC Hydro to obtain its consent to amend the environmental protection assessments to increase the installed capacity of the Boulder Creek and Upper Lillooet river hydroelectric facilities and to cancel the North Creek hydroelectric facility.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
Creek Power, email info@upperlillooethydro.com.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

To advertise email advertising@creamermedia.co.za or click here

Latest News

SKAO director-general Prof Jessica Dempsey
The SKA Observatory has a new head
2nd June 2026 By: Rebecca Campbell

Showroom

VEGA Controls SA (Pty) Ltd
VEGA Controls SA (Pty) Ltd

For over 60 years, VEGA has provided industry-leading products for the measurement of level, density, weight and pressure. As the inventor of the...

VISIT SHOWROOM 
Iritron
Iritron

Iritron delivers advanced automation, control, and optimisation solutions to the Mining, Minerals & Metals, Consumer Package Goods and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.057 1.131s - 145pq - 2rq
Subscribe Now