Serra Norte mining complex, Brazil
This article has been supplied.
Name of the Mine
Serra Norte mining complex.
Location
Part of Vale’s Northern System, located in the municipality of Parauapebas, in the Brazilian state of Pará.
Mine Owner/s
Vale.
Brief Description
The Serra Norte mining complex is a production stage property, part of Vale’s Northern System, comprising the N1, N2, N3, N4 and N5 orebodies.
Brief History
The Serra Norte mines have been operating since 1984.
Primary Metals/Minerals
Iron-ore.
Secondary Metals/Minerals
None stated.
Geology/Mineralisation
The main Carajás iron-ore deposits are associated with flat-topped elevated plateaus, defined along two main morphological alignments corresponding to Serra Norte and Serra Sul. These alignments form the flanks of the Carajás Syncline structure.
The Serra Norte complex corresponds to the inverted flank of the Carajás Syncline.
Mineralisation occurs mainly as a product of supergenic enrichment, developed over jaspilites (banded iron formation, or BIF, interlayered with basalts), generating a high-grade ore comprising friable hematite, compact hematite, and manganiferous hematite. The main structural controls are faults and folds that favoured the BIFs thickening of the levels of jaspilite, by duplication and the efficiency of supergenic processes through the tilting and fracturing of these rocks.
Reserves
Total proven and probable reserves as at December 31, 2021, were estimated at 1.59-million tonnes grading 65.8% iron.
Resources
Total measured and indicated resources as at December 31, 2021, were estimated at 1.08-billion tons grading 66.3% iron. Inferred resources are estimated at 293.4-million tons grading 66% iron.
Mining Method
Openpit.
Major Infrastructure/Equipment
Ore is hauled by off-road trucks to strategically positioned primary crushing facilities, and waste is hauled to waste dumps. Plant 1, with a throughput of 80-million tonnes a year, has a mixed beneficiation process – 55% wet and 45% dry. Plants 2 and 3 have a 100% natural moisture process, with production rates of 40-million tonnes and 20-million tonnes a year respectively.
Prospects
The current life-of-mine plan runs from 2022 until 2038. The mine plan involves opening new mining areas for extraction at the complex’s N1, N2 and N3 orebodies.
Additionally, Plant 1 is undergoing a conversion to a 100% natural moisture process, which is expected to be completed between 2024 and 2025.
Contact Details
Vale
Email vale.ri@vale.com
Sources
Vale. http://www.vale.com (2022).
Vale Form 20-F, as filed with the Securities and Exchange Commission on April 14, 2022.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation
















