Second Fortune underground gold mine project, Australia

5th September 2014

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

Name and Location
Second Fortune underground gold mine project, Australia.

Client
Exterra Resources.

Project Description
A prefeasibility study (PFS) on the Second Fortune mine, in Western Australia, has confirmed a robust, low-capital, low operating cost gold mining project.

The project’s main lode has total mineral resources of 237 100 t grading 10 g/t gold, and minor lode mineral resources estimated at 241 000 t grading 7 g/t.

The PFS is based on underground mining of the Second Fortune main lode, with ore processed off site under an ore purchase heads of agreement with Saracen Gold Mines. The ore will be delivered to Saracen’s Carosue Dam processing plant, 80 km to the south.

Underground mining will be conducted through a portal cut in the floor of the current pit. A 4.5 m × 4 m decline will be developed to the base of the current workings, 62 m below surface. Level drives will be developed at 20 m intervals from crosscuts centrally located along the strike. Mining will involve long-hole retreat open stoping, with a combination of mechanical and hand-held methods, using a single boom jumbo.

Average annualised production is estimated at 20 000 oz of gold.

The project has an initial mine life of 2.5 years.

Net Present Value/Internal Rate of Return
The project has a net present value at 8% of A$13.4-million and a cash payback period of 14 months.

Value
Preproduction costs are estimated at A$5-million.

Duration
Not stated.

Latest Developments
Exterra has all regulatory approvals in place to start mining at Second Fortune.

Key Contracts and Suppliers
Ravensgate and Q G Consulting (geology resource estimation); Intermine Engineering Consultants (ore reserves and underground mine design/financial modelling); MineGeoTech (geotechnical studies); Rockwater (groundwater and surface-water studies); ALS Metallurgy (metallurgical testwork); Coffey (evaporation pond design); and MBS Environmental (Geochemical and environmental studies).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Exterra Resources, tel +61 8 6315 1411 or fax +61 8 9486 7093.
Ravensgate, tel +61 8 9226 3606 or fax +61 8 9226 3607.
QG Consulting, tel P. +61 8 9433 3511.
Intermine Engineering Consultants, tel +61 8 9319 2940.
MineGeoTech, cell +61 407 997 376 or fax +61 8 9091 6204.
Rockwater, tel + 61 8 9284 0222, fax +61 8 9284 1785 or email consult@rockwater.com.au.
ALS Metallurgy, tel +61 8 9344 2416.
Coffey, tel +61 8 9091 7720, fax +61 8 9021 1764 or email contactus@coffey.com.
MBS Environmental, tel +61 8 9226 3166, fax +61 8 9226 3177 or email info@mbsenvironmental.com.au.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Rosond
Rosond

ROSOND provides fast, efficient, safe, and cost-effective drilling and grouting services to mining and exploration industries throughout Africa.

VISIT SHOWROOM 
AirNox Pty Ltd
AirNox Pty Ltd

AirNox (Pty) Ltd is a level 1 BBBEE manufacturer of complete AdBlue® solutions for operators of SCR diesel engines and AUS40 across South Africa...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.051 1.051s - 147pq - 2rq
Subscribe Now