https://www.engineeringnews.co.za

Rio Tinto Coal Mozambique hit by lower reserves, transport problems

18th January 2013

By: Keith Campbell

Creamer Media Senior Deputy Editor

  

Font size: - +

The reserves of metallurgical coal in Rio Tinto’s Benga project in the Tete province of Mozambique are smaller than originally believed, reported local media on Friday. Benga is operated by Rio Tinto Coal Mozambique (RTCM) and, in a press release to the Mozambican media, it reported that it had undertaken extensive prospecting on its mining sites since 2011, when it bought them from Australian junior Riversdale Mining.

The analysis of the data gathered by this prospecting has resulted in “a downward revision of the estimates of the recoverable volume of metallurgical coal in the mining areas ... and also a re-evaluation of the scale that the turnover can reach”.

Inadequate transport infrastructure for the mined coal is also a problem. Originally, RTCM planned to ship the coal on barges down the Zambezi river, but this did not win the necessary government approvals. There were reportedly also problems with dredging the river.

“The combination of smaller volumes of recoverable metallurgical coal and the impossibility of increasing production as originally projected due to the limitations of infrastructure resulted in a reduction of the book value of Rio Tinto Coal Mozambique and was recorded as an impairment in the accounts of Rio Tinto,” stated the company.

The impairment totalled $4-billion, and resulted in the resignation of Rio Tinto group executive: strategy Doug Ritchie, who had overseen the acquisition of Benga. (The Mozambique impairment formed part of total Rio Tinto impairments of $14-billion which led to the resignation of group CEO Tom Albanese.)  

“[T]he production of coal by Rio Tinto Coal Mozambique is, currently, limited by the lack of transport infrastructure capacity,” admitted the company. It is in the “process of identifying alternative supply routes” and, in this regard, is “continuing to work with the Mozambican government”.

Nevertheless, RTCM is still seen by the group as “in the last analysis, a valuable metallurgical coal business”. It will “continue to increase the production of metallurgical coal at Benga”, because “it is a rare geological resource and without substitute in the steel industry”. Rio Tinto expects the metallurgical coal price to rise in the future because it expects a strong future demand for steel.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Iritron
Iritron

Iritron delivers advanced automation, control, and optimisation solutions to the Mining, Minerals & Metals, Consumer Package Goods and...

VISIT SHOWROOM 
Condra Cranes
Condra Cranes

ISO-certified Condra manufactures overhead cranes, portal cranes, cantilever cranes and crane components: hoists, drives, end-carriages, brakes and...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.048 0.946s - 140pq - 2rq
Subscribe Now