https://www.engineeringnews.co.za

Red Mountain gold project, Canada

7th September 2018

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Red Mountain gold project.

Location
North-west British Columbia, Canada.

Client
IDM Mining.

Project Description
A feasibility study has demonstrated that the project is a high-margin, low-capex underground gold mine with a short development timeline, producing more than 90 000 oz/y of gold over the first two years of operation with a life-of-mine average yearly production of 78 000 oz. The proposed mine will initially operate year-round for about six years.

The mine plan is based on a ramp access underground mining operation, producing an average of 1 045 t/d of ore from a blend of mining methods, including:
• transverse and longitudinal longhole stoping for mining blocks dipping steeper than 55°, which represent 63% of the reserves and is the preferred mining method from a productivity and operating-cost perspective;
• cut-and-fill for mining areas with dips of less than 55º and zones not amenable to longhole stoping, which is more selective and represents 33% of reserves; and
• access and stope crosscut development, which forms the remaining 4% of the potentially mineable tonnage.

The deposit will initially be accessed from the existing portal and exploration ramp, in addition to a new portal accessing the top level of the mine, which will be used for ventilation exhaust and a secondary escape way. A third, lower access, to be used for haulage, will be added in Year 1 of the mine life.

Testwork has shown that Red Mountain mineralisation can be treated using conventional mineral processing techniques for the recovery of gold and silver. A trade-off study was conducted to compare the processing of mill feed material using either a leach or a flotation/regrind/leach circuit. The carbon-in-leach (CIL) circuit was selected based on the results of the trade-off study and metallurgical test results.

The plant will comprise three-stage crushing; primary and secondary grinding; preleach thickening and CIL; cyanide destruction; carbon processing and gold refining; and tailings disposal at the tailings management facility. The grinding circuit product size is targeted at about P80 of 25 μm, and CIL to recover gold and silver. The crushing circuit will operate at an availability of 75%, while the milling and CIL circuits will operate 24 h/d, 365 d/y at an availability of 92%.

Jobs to Be Created
Not stated.

Net Present Value/Internal Rate of Return
The project base case estimate generates a pretax net present value, at a 5% discount rate, of C$155-million and an internal rate of return of 40%, with a payback of 1.7 years.

Value
Initial capital expenditure to fund construction and commissioning is estimated at C$135.7-million.

Duration
The overall construction and commissioning period for the project is estimated at about 15 months from the start of work on the site access road to first gold pour and will be preceded by nine months of engineering and procurement.

Latest Developments
The Environmental Assessment Office has referred the Red Mountain project’s environmental certificate application to provincial Ministers for a decision.

The Minister of Environment and Climate Change Strategy and the Minister of Energy, Mines and Petroleum Resources have up to 45 days to announce a decision.

The Red Mountain proposal is also subject to a federal environmental assessment process, which is nearly two-thirds through the 365-day timeline.

IDM expects to receive federal approval in late 2018 or early 2019.

IDM is completing an updated feasibility study, which will incorporate value engineering improvements from the 2017 study and the increased measured and indicated resources from the June 2018 resource estimate.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
Not stated.

Contact Details for Project Information
IDM Mining CEO and director Robert McLeod, tel +1 604 681 5672, fax +1 604 484 7155 or email rm@idmmining.com.

 

 

To watch Creamer Media's latest video reports, click here
 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Bell Equipment
Bell Equipment

As one of South Africa's leading manufacturers, Bell Equipment distributes and exports its wide range of heavy equipment globally to mining,...

VISIT SHOWROOM 
SABAT
SABAT

From batteries for boats and jet skis, to batteries for cars and quad bikes, SABAT Batteries has positioned itself as the lifestyle battery of...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.098 1.228s - 147pq - 2rq
Subscribe Now