https://www.engineeringnews.co.za
Africa|Electrical|rail|Service|Services|Infrastructure|Cables
Africa|Electrical|rail|Service|Services|Infrastructure|Cables
africa|electrical|rail|service|services|infrastructure|cables

PRASA starts rehabilitation work on three Gauteng corridors

Image of a PRASA train

Photo by Donna Slater

17th May 2022

By: Irma Venter

Creamer Media Senior Deputy Editor

     

Font size: - +

The Passenger Rail Agency of South Africa (PRASA) says it will terminate rail services on three Gauteng corridors for the next few months to allow for the rehabilitation and restoration of the electrical cables and traction substations that were vandalised or stolen during the Covid-19 Level 5 hard lockdown.

The revamp will also allow PRASA  to “run more efficient train services and to introduce the electrical motor units which form part of the agency’s modernisation programme”.

The rehabilitation work is part of an effort to recover services on the country’s top-ten high-volume passenger rail corridors.

The ten corridors were selected based on the demand for services, the extent of damage and the time required to recover and rehabilitate the infrastructure, says the agency.

The corridors earmarked for immediate rehabilitation work in Gauteng are Pienaarspoort to Pretoria (May 23 to August); Naledi to Johannesburg (May 23 to September); and Leralla to Elandsfontein (May 30 to October).

Work on the line between Pretoria and Kaalfontein is also scheduled to start in the next few weeks, with passenger services expected to resume by the end of October.

In Cape Town, rehabilitation work on the Central Line has begun, as part of an effort to recover passenger services between Cape Town and Langa.

The process to relocate illegal settlements on the rail tracks is underway, and is being led by the Human Development Agency, notes PRASA.

The service between Cape Town and Langa via Mutual is currently operational, while rehabilitation work on the Cape Town to Langa via Pinelands route 90% complete.

Work is also underway to recover the service between Langa and Nyanga, as well as Cape Town to Bellville via Sarepta.

 

Edited by Creamer Media Reporter

Comments

Showroom

Rio-Carb
Rio-Carb

Our Easy Access Chute concept was developed to reduce the risks related to liner maintenance. Currently, replacing wear liners require that...

VISIT SHOWROOM 
Goodwin Submersible Pumps Africa (Pty) Ltd
Goodwin Submersible Pumps Africa (Pty) Ltd

Goodwin Submersible Pumps Africa is sole distributors for Goodwin electrically driven, submersible, abrasion resistance slurry pumps.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Magazine round up | 19 April 2024
Magazine round up | 19 April 2024
19th April 2024

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







sq:0.079 0.136s - 180pq - 2rq
Subscribe Now