https://www.engineeringnews.co.za

Perkoa zinc project, Burkina Faso

6th December 2013

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

  

Font size: - +

This article has been supplied.

Name and Location
Perkoa zinc project, Burkina Faso.

Client
The project is a joint venture between Blackthorn Resources (39.9%) and GlencoreXstrata (50.1%), with the remainder being held by the government of Burkina Faso (10%).

Project Description
The project involves the development of the first zinc mine in West Africa.

The project is located within the Proterozoic Boromo greenstone belt, about 120 km west of Burkina Faso’s capital, Ouagadougou, and has a Joint Ore Reserves Committee-compliant probable ore reserve of 6.3-million tonnes at a mine head grade of 13.9% zinc (at a 9% zinc cutoff), equating to 873 400 t of contained zinc metal.

The project includes:
• the extraction of silver and lead concentrate in a separate processing circuit by bulk mining the hanging-wall zone of the deposit;
• opencut mining of near-surface mineralisation, situated along strike and adjacent to the underground mining area; and
• increased throughput of the processing plant from 720 000 t/y to 1-million tonnes a year.

Value
$260-million.

Duration
The official opening ceremony of the Perkoa zinc project was held on site on January 19, 2013.

Latest Developments
In the quarter ended September 30, 2013, first deliveries of saleable product were made to the Port of Abidjan, in Côte d’Ivoire, as part of the process of testing the logistics chain from mine to port, before embarking on the full-scale transportation of concentrates.

Ore throughput and concentrate quality have been in line with design specifications for a single ball mill operation. The second ball mill is in transit, but has yet to be delivered to the mine.

Installation and commissioning have, therefore, been delayed and a revised installation target date will be communicated to the market once an updated schedule has been received from Glencore.

Key Contracts and Suppliers
None stated.

On Budget and on Time?
The cost of the project has escalated from $140-million to $180-million.

Contact Details for Project Information
Blackthorn Resources, tel +226 50 31 66 35, fax +226 50 31 70 97 or email info@blackthornresources.com.au, or MD Scott Lowe, tel +61 2 9357 9000.
Glencore Xstrata, tel +41 41 709 2000 or fax +41 41 709 3000.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ALBIS FLANGES (Pty) Ltd
ALBIS FLANGES (Pty) Ltd

ALBIS FLANGES — founded in 1965 — is a petro-chemical approved manufacturer of flanges and fittings in most grades of steel, listed with Sasol,...

VISIT SHOWROOM 
Sulzer Pumps (SA) (Pty) Ltd
Sulzer Pumps (SA) (Pty) Ltd

Sulzer South Africa, established in 1922, partners with critical industries like power, oil & gas, water, mining, and chemicals to boost...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.049 0.834s - 146pq - 2rq
Subscribe Now