https://www.engineeringnews.co.za

Parys Mountain copper/zinc/lead/gold/silver project, UK

19th February 2021

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Parys Mountain copper/zinc/lead/gold/silver project.

Location
Island of Anglesey, in North Wales, in the UK.

Project Owner/s
Anglesey Mining.

Project Description
Anglesey has reported positive results in a preliminary economic assessment (PEA) on the Parys Mountain project.

This PEA includes an updated mineral resource statement showing 5.2-million tonnes of indicated resources at a combined base metal grade of 4.3%, together with 11.7-million tonnes of inferred resources at a combined base metals grade of 2.8%, based on the revised estimated cutoff cost of $48/t.

Three separate development alternatives were evaluated. Case A proposes using only the White Rock and Upper Engine zones, with inferred material included at a planned production rate of 1 500 t/d over a 12-year mine life. Case B is similar to Case A, but with some initial production coming from a proposed small opencut operation, producing 1 500 t/d over an 11-year mine life. Case C uses all the reported resources in the White Rock and Upper Engine zones, but also includes the inferred resources in the Lower Engine zone, the Garth Daniel zone and the Northern Copper zone, producing 3 000 t/d over a 12-year mine life. The expanded Case C was chosen as the most attractive option.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Case A has a pretax net present value, at a 10% discount rate, of $36.12-million and an internal rate of return of 19.6%, with a payback of 7.2 years. Case B has a pretax net present value, at a 10% discount rate, of $41.84-million and an internal rate of return of 26.4%, with a payback of  6.1 years.

Case C has a pretax net present value, at a 10% discount rate, of $120.32-million and an internal rate of return of 26%, with a payback of 6.2 years.

Capital Expenditure
Preproduction capital expenditure for Case A is estimated at $70.44-million, Case B at $57.52-million and Case C at $99.02-million.

Planned Start/End Date
Not stated.

Latest Developments
Recommendations for future work, including some extra exploration drilling to add some inferred resources to the indicated category, have been proposed.

Key Contracts, Suppliers and Consultants
Micon International (PEA).

Contact Details for Project Information
Anglesey Mining CEO Bill Hooley,  tel +44778557 2517 or email billhooley@angleseymining.co.uk.
Anglesey Mining finance director Danesh Varma, +44774 0 93 2766 or email danesh@angleseymining.co.uk.

Edited by Martin Zhuwakinyu
Creamer Media Magazine Managing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Industrial Nozzles & Systems (Pty) Ltd
Industrial Nozzles & Systems (Pty) Ltd

Industrial Nozzles & Systems (Pty) Ltd (Est. 2000) exclusive representative in Southern Africa for LECHLER GmbH (Est. 1879) - Europe's leading...

VISIT SHOWROOM 
ATI Systems
ATI Systems

ATI systems comprises five divisions: electrical assemblies, drives and controls, feedback sensors, enclosures, and strip guiding.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.056 0.399s - 147pq - 2rq
Subscribe Now