https://www.engineeringnews.co.za

Oz shares tumble after resource and production outlook update

Oz shares tumble after resource and production outlook update

Photo by Bloomberg

11th December 2013

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

  

Font size: - +

JOHANNESBURG (miningweekly.com) – The share price of ASX-listed metals miner Oz Minerals dropped by as much as 75c a share on Wednesday as shareholders expressed their discontent over the lower-than-expected 2014 production forecast and the company’s failure to add to the resource base.

Oz Minerals has told shareholders that 2014’s copper production would be between 75 000 t and 80 000 t, compared with the estimated 2013 production of between 70 000 t and 75 000 t.

Gold production, however, was expected to increase to between 130 000 oz and 140 000 oz, from the 120 000 oz to 130 000 oz expected this year.

The relatively unchanged production guidance came despite shareholders expecting an increased output during that time.

Instead, Oz stated that copper production would decline to 95 000 t/y between 2015 and 2018, while gold production would also only be about 95 000 oz/y during the same period.

Based on the current life-of-mine plan, mining in the Malu openpit was expected to continue until 2018, while stockpiles would be processed after this period. Mining from the Ankata underground mine would continue until 2022.

Meanwhile, Oz reported that the mineral resource at the Prominent Hill mine was currently estimated at 155-million tonnes, grading 1.3% copper and 0.5 g/t gold, as well as 2.9 g/t silver.

The overall copper/gold mineral resource at the mine decreased by some 55-million tonnes on the June 2012 resource estimate, while contained copper metal decreased by 565 000 t from the 2012 estimate.

The change resulted from an increase in the resource cutoff grade, updated geological interpretation for Malu and, to a lesser extent, mining depletion.

The company was trading at a low of A$2.11 a share on Wednesday, down from an opening price of A$2.85 apiece.

Edited by Mariaan Webb
Creamer Media Contract Publishing Editor

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Latest News

SKAO director-general Prof Jessica Dempsey
The SKA Observatory has a new head
2nd June 2026 By: Rebecca Campbell

Showroom

Columbus Stainless
Columbus Stainless

Columbus Stainless, based in Middelburg, Mpumalanga, is Africa’s only producer of stainless steel flat products. In addition, Columbus is the only...

VISIT SHOWROOM 
Kriel Occupational Health Centre
Kriel Occupational Health Centre

Occupational health services, mobile clinics, wellness campaigns, aviation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.051 1.055s - 140pq - 2rq
Subscribe Now