Name of the Project
Nolans neodymium/praseodymium rare earths project.

Location
Northern Territory, Australia.

Project Owner/s
Arafura Resources.

Project Description
The Nolans project will encompass a mine, a process plant ­– comprising beneficiation, extraction and separation plants – and related infrastructure, to be built at the Nolans site.

An updated feasibility study has optimised the production schedule and financial outcomes of the project. The pit optimisations, mine designs, ore reserves and mining inventory are unchanged from the updated mining study in March 2020.

The project has ore reserves of 29.5-million tonnes grading 2.9% total rare-earth oxides, 13% phosphorous pentoxide and neodymium/praseodymium enrichment of 26.4%.

The updated feasibility study has reported a minor increase in the concentrate processing capacity of the process plant from 330 000 t/y to 340 000 t/y – the definitive feasibility study was based on 300 000 t/y.

The beneficiation capacity has increased from one-million tonnes a year to 1.5-million tonnes later in the life-of-mine to accommodate lower run-of-mine head grades.

Minor changes to the hydrometallurgical recovery of rare earths and phosphorous pentoxide, resulting from the changes to the processing plant design, have also been reported.

The project is expected to produce 4 440 t/y of neodymium/praseodymium oxide over its 38-year mine life. Production of middle and heavy rare-earth oxides is estimated at 474 t/y and phosphoric acid at 144 393 t/y.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has an after-tax net present value, at an 8% discount rate, of A$1.4-billion and an internal rate of return of 18.1%.

Capital Expenditure
A$1.06-billion.

Planned Start/End Date
First ore processing is expected in October 2024, with first ore production expected towards the end of 2024. These dates are contingent on securing funding for the activities required.

Latest Developments
Arafura Resources has been awarded A$30-million for the Nolans project under the federal government’s Modern Manufacturing Initiative.

The federal government announced more than A$243-million in funding support for four critical minerals projects under the Collaboration Stream of the A$1.3-billion initiative on March 16.

Key Contracts, Suppliers and Consultants
KBR, Wave International and Arafura’s geological, metallurgical and project personnel updated definitive feasibility study); Mining Plus (mine planning, design and scheduling, along with mining cost estimation); Simulus (process simulation); and Infinity Corporate Finance (financial modelling).

Contact Details for Project Information
Arafura Resources, tel +61 8 6210 7666 or email arafura@arultd.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Latest News

SKAO director-general Prof Jessica Dempsey
The SKA Observatory has a new head
2nd June 2026 By: Rebecca Campbell

Showroom

Columbus Stainless
Columbus Stainless

Columbus Stainless, based in Middelburg, Mpumalanga, is Africa’s only producer of stainless steel flat products. In addition, Columbus is the only...

VISIT SHOWROOM 
Kriel Occupational Health Centre
Kriel Occupational Health Centre

Occupational health services, mobile clinics, wellness campaigns, aviation.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.051 0.945s - 127pq - 2rq
Subscribe Now