Mulga Rock uranium project, Australia
Name and Location
Mulga Rock uranium project (MRUP), Australia.
Client
Vimy Resources.
Project Description
A scoping study completed on Mulga Rock supports Vimy’s view that the MRUP is one of the best undeveloped uranium projects in Australia. The results confirm the potential for the MRUP to be a low-cost uranium producerC with a 16-year mine life and an estimated total production of 47-million pounds of uranium (U3O8).
Mulga Rock has a total resource estimate of 59.7-million tonnes at 550 parts per million of U3O8 for a contained 72.7-million pounds of U3O8.
The project comprises the Mulga Rock East (MRE) and Mulga Rock West (MRW) mining centres, which are about 20 km apart. MRE contains more than 65% of the total recoverable uranium, which is of a higher grade than MRW’s. Mining will begin at MRE, which will include the processing plant.
The scoping study envisions a large-scale openpit. As a result of the large lateral extent and horizontal geometry, Vimy is proposing to use conventional truck-and-shovel and highly mechanised ‘strip‘ mining techniques similar to those used in coal and mineral sands mining.
The process plant will use low-cost acid leaching and resin-in-pulp methods.
Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 10% discount rate, of A$764-million, with an internal rate of return of 39% and a 2.6-year payback.
Value
The estimated capital cost to build the processing plant and infrastructure at the MRUP is A$332-million, including a contingency of A$41-million.
In Year 7 of operations, an additional A$15-million in capital investment will be required to establish a third mining field to expand the proposed beneficiation plant, which will process additional ore feed as the uranium ore grade decreases from Year 8 onwards.
Duration
Not stated.
Latest Developments
The prefeasibility study is expected to be completed in August 2015.
An investment decision to develop the MRUP is expected in the second half 2016.
Key Contracts and Suppliers
(Amec Foster Wheeler (scoping study).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Vimy Resources, tel +61 8 9389 2700 or email info@vimyresources.com.au.
Amec Foster Wheeler group corporate affairs director Julian Walker, tel +44 20 7429 7500 or email julian.walker@amecfw.com.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















