Mponeng life-of-mine extension project, South Africa – update

Image of the Mponeng mine

Photo by Harmony Gold Mining Company

8th May 2026

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Mponeng life-of-mine (LoM) extension project.

Location
Near Carletonville, on the West Rand, about 90 km south-west of Johannesburg, in South Africa.

Project Owner/s
Gold mining specialist Harmony Gold Mining Company.

Project Description
Mponeng comprises two well-defined orebodies – the Carbon Leader reef (CLR) and Ventersdorp Contact reef (VCR) – with average face grades of more than 14 g/t and recovered grades of more than 9 g/t gold.

The project will access the VCR and CLR orebodies below existing infrastructure. This will be achieved through the selective extraction of the high-grade VCR areas to the east and west, through independent accesses, while eliminating the requirement to mine the lower-grade fretted terrace in the geographical centre of the orebody. 
The CLR at the TauTona shaft pillar will also be mined, accessing this through the 75 Level at Mponeng. 

At steady state, the project will produce 250 000 oz of gold over a 20-year mine life.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
Not stated.

Capital Expenditure
The project requires capital of R7.9-billion and is being funded in house through Mponeng’s excess operating free cash flows.

Capital expenditure guidance for the 2026 financial year is about R2.39-billion.

Planned Start/End Date
Not confirmed. 

Latest Developments
Harmony reported in its interim results for the six months ended December 31, 2025, that the group continued to invest in high-return, long-life projects, including the LoM extension at Mponeng.

In its operating update for the first quarter of the 2026 financial year, Harmony reported that higher group capital expenditure reflected investment in major projects, including the Mponeng LoM extension. 

The company also noted that contractor and trackless mobile machinery challenges had delayed progress at Mponeng, as well as Moab Khotsong, but these timelines had been incorporated into its LoM plans.

Key Contracts, Suppliers and Consultants
None stated.

Contact Details for Project Information
Harmony Gold Mining Company, tel +27 11 411 2000 or email corporate@harmony.co.za.
Mponeng mine, tel +27 18 700 1890/+27 18 700 1749.


 

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

WearCheck
WearCheck

Leading condition monitoring specialists, WearCheck, help boost machinery lifespan and reduce catastrophic component failure through the scientific...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.046 0.706s - 132pq - 2rq
Subscribe Now