https://www.engineeringnews.co.za

Metro ups output hopes for 2019

29th January 2019

By: Esmarie Iannucci

Creamer Media Senior Deputy Editor: Australasia

     

Font size: - +

PERTH (miningweekly.com) – Bauxite miner Metro Mining has produced 743 000 t of bauxite during the three months to December, down from the 859 000 t produced in the previous quarter, after ex Tropical Cyclone Owen resulted in the suspension of the Bauxite Hills mine operations for a period of six days in mid-December.

Bauxite tonnes shipped during the quarter reached 816 000 t, which was in line with the 822 000 t shipped during the previous quarter, with the Bauxite Hills operation achieving an annualised run-rate of around 2.5-million tonnes a year for the second consecutive quarter.

Metro told shareholders that based on strong operating performance and strong customer demand, the company has implemented a series of low-cost operational improvements and upgrade initiatives to expand production in 2019 from 3-million tonnes a year to 3.5-million tonnes a year.

Meanwhile, a definitive feasibility study for the Stage 2 expansion of the Bauxite Hills mine, to six-million tonnes a year, was on track for completion by the second quarter of 2019, with the expansion expected to take effect by 2021.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

ALBIS FLANGES (Pty) Ltd
ALBIS FLANGES (Pty) Ltd

ALBIS FLANGES — founded in 1965 — is a petro-chemical approved manufacturer of flanges and fittings in most grades of steel, listed with Sasol,...

VISIT SHOWROOM 
Sulzer Pumps (SA) (Pty) Ltd
Sulzer Pumps (SA) (Pty) Ltd

Sulzer South Africa, established in 1922, partners with critical industries like power, oil & gas, water, mining, and chemicals to boost...

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.054 1.211s - 140pq - 2rq
Subscribe Now