Mbeya coal-to-power project, Tanzania
Name of the Project
Mbeya (formerly Rukwa) coal-to-power project (MCPP).
Location
Tanzania.
Client
Kibo Mining.
Project Description
A mining definitive feasibility study (MDFS) on the MCPP has confirmed the Mbeya coal mine as a robust project with strong financial and commercial indicators.
The MDFS comprised the optimisation of the mine design, a detailed mine design based on the results from the restated Mbeya coal resource and the final coal requirement for the Mbeya power station as stated in the power definitive feasibility study (PDFS).
Kibo increased the total mineral resource of the project in April 2016 from 109.2-million tonnes, disclosed in the 2012 resource statement, to 120.8-million tonnes, comprising a measured resource of 20.9-million tonnes, an indicated resource of 88.6-million tonnes and an inferred resource of 11.3-million tonnes.
Results from the MDFS correlate accurately with those of the mining prefeasibility study (MPFS) completed in August 2015, and have reconfirmed the Mbeya coal mine as a robust project with strong financial and commercial indicators.
It has been proven that constant coal production over the total life-of-mine (LoM) can be achieved.
The mining method developed for the Mbeya coal mine has been confirmed as modified terrace mining.
Overburden will be removed using a free dig (truck-and-shovel) method, with coal seam and interburden mining using mechanised continuous surface mining.
The mining project has been assessed for a 28-year mine life, with average coal production estimated at 1.49-million tons over the LoM. The coal will be fed into a mine-mouth thermal power station.
The Mbeya PDFS, completed in May 2016, has confirmed the primary base case recommended by the power prefeasibility study (power-PFS) as the optimal selection for final design of the station, which comprises circulating fluidised-bed boiler technology and 300 MW, configured as two 150 MW units.
The power-PFS production target of 1 840 GWh/y has also been confirmed.
Average coal consumption has been confirmed at 1 497 432 t/y using run-of-mine product from the colocated mine site and within mine design parameters.
Minor technical concerns identified during the power-PFS were eliminated during the PDFS.
Further, based on the recently restated Mbeya coal resource, the PDFS includes provision for near-term expansion of the power station to at least 600 MW.
Jobs to be Created
Not stated.
Net Present Value/Internal Rate of Return
The MDFS has estimated the internal rate of return at 69.2% – a 15% improvement from 53.9% stated in the MPFS – with a payback of 2.4 years – a 7% improvement from 2.6 years stated in the MPFS.
Value
The MDFS has estimated the peak funding requirement for the project at $17-million – a 54% reduction from the MPFS.
The PDFS has confirmed the total estimated project cost of the thermal power plant as well below the cost estimate stated in the power-PFS.
The positive PDFS results will further improve the already strong financial feasibility figures of the MCPP.
Duration
Not stated.
Latest Developments
Kibo Mining has signed a collaboration agreement with General Electric International (GE), which will supply equipment, technology and services to the Mbeya coal-to-power project (MCPP) power plant.
GE will also assist Kibo in implementing the power plant project.
The agreement follows the signing of a memorandum of understanding in September.
Key Contracts and Suppliers
GE (equipment, technology and services).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Kibo Mining, tel +353 91 865367, fax +353 91 755066 or email info@kibomining.com.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation