https://www.engineeringnews.co.za

Mahenge Liandu graphite project, Tanzania

16th August 2019

By: Sheila Barradas

Creamer Media Research Coordinator & Senior Deputy Editor

     

Font size: - +

Name of the Project
Mahenge Liandu graphite project.

Location
Tanzania.

Project Owner/s
Armadale Capital.

Project Description
The Mahenge Liandu deposit is one of the highest-grade, large-flake deposits globally after the recent upgrade to 51.1-million tonnes at 9.3% total graphitic carbon (TGC), including 38.7-million tonnes in the indicated category at 9.3% TGC and 12.4-million tonnes in the inferred category at 9.1% TGC.

The scoping study completed on the project is based on a throughput of 400 000 t/y, producing an average of 49 000 t/y of high-quality graphite products during a 32-year life-of-mine.

The deposit has a low average strip ratio of 1:1 for the life of the mine and a very low operating cost of $408/t. There remains significant scope to further improve returns using staged expansions, as the current mine plan is based on about 25% of the total resource.

Potential Job Creation
Not stated.

Net Present Value/Internal Rate of Return
The project has a pretax net present value, at a 10% discount rate, of $348.7-million and an internal rate of return of 122%, with a payback of 1.2 years.

Capital Expenditure
The project has a low development capital expenditure of $34.9-million.

Planned Start /End Date
The company plans on starting production in 2021.

Latest Developments
Armadale Capital has confirmed that premium-quality, high-value graphite concentrates can be produced from its Mahenge Liandu deposit.

The company has reported exceptionally high-purity results from ongoing metallurgical testwork from a diamond core drilling programme at the project. 

The results from the testwork has found concentrates of 96.8% of jumbo size graphite flakes, and 97.1% for large and medium flakes. This exceeds the 95% average that the company used in the scoping study.

Further optimisation work is under way to maximise the proportion of large flake sizes.

The testwork forms part of a definitive feasibility study for the 400 000 t/y, 32-year mine life graphite operation.

The company aims to finalise the study towards the end of this year.

Key Contracts and Suppliers
Battery Limit (scoping study).

On Budget and on Time?
Not stated.

Contact Details for Project Information
Armadale Capital, tel +44 20 7236 1177 or email info@armadalecapitalplc.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Roytec Global (Pty) Ltd
Roytec Global (Pty) Ltd

Roytec Global is an international company specializing in liquid / solid and mineral separation technologies for the Mining and Industrial sectors.

VISIT SHOWROOM 
Virtual Gas Network (Pty) Ltd
Virtual Gas Network (Pty) Ltd

Virtual Gas Network supplies compressed natural gas via a virtual gas distribution network.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.045 0.818s - 127pq - 2rq
Subscribe Now