John F Kennedy aircraft carrier project, US
Name and Location
John F Kennedy (CVN 79) aircraft carrier project, US.
Client
US Navy.
Project Description
The project involves the construction of the second Ford-class nuclear-propelled aircraft carrier (CVN) – the John F Kennedy (CVN 79).
The planned carrier is designed to reduce required maintenance by 30%, compared with previous carriers and save the US Navy an estimated $4-billion in operational costs over its 50-year life.
The new-class carrier features several new technologies – including the General Atomics Electromagnetic Aircraft Launch System and the Advanced Arresting Gear (AAG), which promise to increase the number of aircraft sorties by almost 25% on its more than 2 ha flight deck, compared with the current Nimitz-class CVN.
The 100 000 t carrier will be capable of reaching speeds of more than 35 knots.
The John F Kennedy is the second ship in the Gerald R Ford (CVN 78) class, representing the first new carrier design since the 1960s.
The Ford is being fitted out at Newport News, and is expected to be delivered and commissioned in 2016.
The Kennedy will be followed by a third ship, Enterprise (CVN 80).
Value
The project is expected to cost an estimated $11.35-billion.
Duration
The CVN 79 will be commissioned between 2023 and 2025.
Latest Developments
Shipbuilder Newport News Shipping, a subsidiary of Huntington Ingalls Industries (HII) laid the keel for the second Ford-class nuclear aircraft carrier in August this year.
The first steel was cut for the Kennedy in December 2010 – since then more than 450 of the ship’s 1 100 structural units have been built under a construction preparation contract that will be used to start erecting the ship’s hull.
Key Contracts and Suppliers
Newport News Shipping (CVN 79 construction).
On Budget and on Time?
Not stated.
Contact Details for Project Information
Newport News Shipping manager of media relations Christie Miller, tel +1 757 380 3581 or
email Christine.miller@hii-co.com.
Article Enquiry
Email Article
Save Article
To advertise email advertising@creamermedia.co.za or click here
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation

















