Great Cobar base metals and gold project, Australia
Name of the Project
Great Cobar base metals and gold project.
Location
Central-western New South Wales, in Australia.
Project Owner/s
Aurelia Metals.
Project Description
A prefeasibility study (PFS) has demonstrated a robust technical and economic case for low-risk brownfield development of the copper-rich Great Cobar deposit through an access decline and underground mining.
The PFS outcomes support the declaration of a maiden ore reserve estimate of 840 000 t at 2% copper, 1 g/t gold and 4 g/t silver, increasing the total peak ore reserve estimate by 19% to 3.2-million tonnes.
Mining will be conducted using a longhole stoping mining method at a maximum ore production rate of 500 000 t/y.
Initial mining and processing of Great Cobar is expected to be conducted over an estimated five-year mine life and deliver a total of 47 000 t copper and 61 000 oz gold.
Aurelia mentions in the PFS that there remains substantial opportunity to further extend the Great Cobar deposit from:
- resource extension up dip and down dip to the Anjea zone within the main copper lens;
- potential economic copper mineralisation down dip of the historically mined central lens to Cagn;
- potential economic gold, lead and zinc mineralisation on the western margin to the historical workings; and
- potential repeat systems down plunge of the Dapville system south of the Great Cobar deposit.
Potential Job Creation
Not stated.
Net Present Value/Internal Rate of Return
The direct cash flow analysis using long-term revenue related assumptions of A$13 353/t copper, A$2 561/oz gold and A$32/oz silver yielded an after-tax net present value, at a7% discount rate, of A$99-million and an internal rate of return of 49%.
Capital Expenditure
Preproduction capital expenditure (capex) is estimated at A$35-million, with residual life-of-mine capex estimated at A$50-million.
Planned Start/End Date
First stope production is expected about 18 months from the start of the access decline; decline works are scheduled to start in July 2022, with forecast delivery of first production ore in late 2023.
Latest Developments
The project will proceed directly to implementation.
Key Contracts and Suppliers
None stated.
Contact Details for Project Information
Aurelia Metals, tel +61 7 3180 5000 or email office@aureliametals.com.au.
Article Enquiry
Email Article
Save Article
Feedback
To advertise email advertising@creamermedia.co.za or click here
Press Office
Announcements
What's On
Subscribe to improve your user experience...
Option 1 (equivalent of R125 a month):
Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format
Option 2 (equivalent of R375 a month):
All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors
including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.
Already a subscriber?
Forgotten your password?
Receive weekly copy of Creamer Media's Engineering News & Mining Weekly magazine (print copy for those in South Africa and e-magazine for those outside of South Africa)
➕
Recieve daily email newsletters
➕
Access to full search results
➕
Access archive of magazine back copies
➕
Access to Projects in Progress
➕
Access to ONE Research Report of your choice in PDF format
RESEARCH CHANNEL AFRICA
R4500 (equivalent of R375 a month)
SUBSCRIBEAll benefits from Option 1
➕
Access to Creamer Media's Research Channel Africa for ALL Research Reports on various industrial and mining sectors, in PDF format, including on:
Electricity
➕
Water
➕
Energy Transition
➕
Hydrogen
➕
Roads, Rail and Ports
➕
Coal
➕
Gold
➕
Platinum
➕
Battery Metals
➕
etc.
Receive all benefits from Option 1 or Option 2 delivered to numerous people at your company
➕
Multiple User names and Passwords for simultaneous log-ins
➕
Intranet integration access to all in your organisation