Gahcho Kué diamond project, Canada

25th July 2014

  

Font size: - +

Name and Location
Gahcho Kué diamond project, Northwest Territories (NWT), Canada.

Client
Gahcho Kué Joint Venture (JV) – a collaboration between De Beers Canada (51%) and Mountain Province Diamonds (49%).

Project Description
Gahcho Kué, which is Chipewyan for ‘a place where big rabbits are found’, is located at Kennady Lake, 280 km north-east of Yellowknife and 80 km east of De Beers’ existing Snap Lake mine, in NWT. The diamond prospect is one of the largest new diamond projects under development globally.

The project consists of the Hearne North and South pipes; the 5034 West pipe, the Central and North-East pipes; the 5034 South pipe; the 5034 North pipe; Wallace; and the Dunn Sheet, Tuzo and Tesla diamondiferous kimberlite pipes, sheets and dykes.

A revised and updated feasibility study on the Gahcho Kué project has confirmed the remote project’s robust metrics.

The Gahcho Kué deposit has current National Instrument 43-101-compliant total probable reserves of 55.5-million carats, contained in 35.4-million tonnes grading 1.57 ct/t.

The mine life has been estimated at 12 years, over which the operation will produce about 53.4-million carats at an average yearly rate of 4.45-million carats using standard drill/blast and truck/shovel equipment and pit designs, which are similar to those of other openpit diamond mines operating in the area.

The average yearly output for the first three years of full production from 2017 to 2019 will be about 5.6-million carats.

Ore will be fed to a three-million-tonne-a-year processing plant, with three stages of crushing, dense-medium separation and X-ray/grease diamond recovery circuits.

Supporting infrastructure includes a 14.1 MW packaged diesel power plant, a 1 350 m gravel airstrip, a five-bay truck shop, an emulsion plant, a 40-million-litre fuel storage facility and a 432-bed accommodation/office complex.

Value
According to the revised and updated feasibility study, the project will cost C$859-million to construct and the operation will require working capital of C$80-million.

Costs to ramp up the operation through to January 2017 have been estimated at C$82-million.

Duration
The start of production is targeted for 2016.

Latest Developments
The Gahcho Kué JV has passed a significant milestone in developing the project after inking an impact benefit agreement (IBA) with the Lutsel K’e Dene First Nation.

The IBA establishes a framework for De Beers, as operator, and the First Nation, to work together over the life of the mine, providing participation opportunities in building and operating the mine.

Under the IBA, the JV will respect the First Nation’s culture and provide certainty of training, employment and business opportunities for members, including “financial provisions” necessary to ensure fair participation in the project’s opportunities.

Gahcho Kué will employ almost 700 people during the two years of construction and about 400 people during its operation.

Key Contracts and Suppliers
JDS Energy & Mining (feasibility study).

On Budget and on Time?
Too early to state.

Contact Details for Project Information
De Beers Canada external and corporate affairs tel + 1 416 645 1710.
Mountain Province Diamonds, tel +1 416 361 3562, fax +1 416 603 8565 or email info@mountainprovince.com.

Edited by Creamer Media Reporter

Article Enquiry

Email Article

Save Article

Feedback

To advertise email advertising@creamermedia.co.za or click here

Showroom

Trotech
Trotech

Design, Construction and Maintenance of Site Erected, Welded Bulk Storage Tanks for the Petrochemical, LNG, Ammonia and Sustainable fuel Sectors.

VISIT SHOWROOM 
Sika South Africa
Sika South Africa

Sika South Africa is a trusted partner for the nation’s infrastructure, commercial, residential, and industrial sectors.

VISIT SHOWROOM 

Latest Multimedia

sponsored by

Option 1 (equivalent of R125 a month):

Receive a weekly copy of Creamer Media's Engineering News & Mining Weekly magazine
(print copy for those in South Africa and e-magazine for those outside of South Africa)
Receive daily email newsletters
Access to full search results
Access archive of magazine back copies
Access to Projects in Progress
Access to ONE Research Report of your choice in PDF format

Option 2 (equivalent of R375 a month):

All benefits from Option 1
PLUS
Access to Creamer Media's Research Channel Africa for ALL Research Reports, in PDF format, on various industrial and mining sectors including Electricity; Water; Energy Transition; Hydrogen; Roads, Rail and Ports; Coal; Gold; Platinum; Battery Metals; etc.

Already a subscriber?

Forgotten your password?

MAGAZINE & ONLINE

SUBSCRIBE

RESEARCH CHANNEL AFRICA

SUBSCRIBE

CORPORATE PACKAGES

CLICK FOR A QUOTATION







301

sq:0.072 1.092s - 147pq - 2rq
Subscribe Now